Citation: | Wang Zhiqiang, Wang Jianming, Guo Lei, Xu Jie. The research on mining along next goaf technology of double gateways excavation in super-long forward distance working face[J]. Journal of Mining Science and Technology, 2017, 2(4): 364-370. |
[1] |
李学华,张农,侯朝炯.综采放顶煤面沿空巷道合理位置确定[J].中国矿业大学学报,2000,29(2):186-189.
|
[2] |
Li Xuehua,Zhang Nong,Hou Chaojiong.Rational position determination of roadway driving along next goaf for fully mechanized top coal caving[J].Journal of China University of Mining & Technology,2000,29(2):186-189.
|
[3] |
侯朝炯,李学华.综放沿空掘巷围岩大、小结构的稳定性原理[J].煤炭学报,2001,26(1):1-7
|
[4] |
Hou Chaojiong,Li Xuehua.Stability principle of big and small structures of rock surrounding road driven along goaf in fully mechanized top coal caving face[J].Journal of China Coal Society,2001,26(1):1-7.
|
[5] |
石永奎,宋振骐,王崇革.软煤层综放工作面沿空掘巷支护设计[J].岩土力学,2001,22(4):509-512
|
[6] |
Shi Yongkui,Song Zhenqi,Wang Chongge.The supporting soft seam design of road driving along next goaf in with fully mechanized top-caving[J].Rock and Soil Mechanics,2001,22(4):509-512.
|
[7] |
王卫军,冯涛,侯朝炯,等.沿空掘巷实体煤帮应力分布与围岩损伤关系分析[J].岩石力学与工程学报,2002,21(11):1590-1593.
|
[8] |
Wang Weijun,Feng Tao,Hou Chaojiong,et al.Analysis on the relationship between stress distribution on intergated coal beside roadway driving along next goaf and damage of surrounding rocks[J].Journal of Rock Mechanics and Engineering,2006,33(11):1590-1593.
|
[9] |
徐金海,缪协兴,张晓春.煤柱稳定性的时间相关性分析[J].煤炭学报,2005,30(4):433-437.
|
[10] |
Xu Jinhai,Miao Xiexing,Zhang Xiaochun.Analysis of the time dependence of the coal pillar stability[J].Journal of China Coal Society,2005,30(4):433-437.
|
[11] |
余忠林,涂敏.大采高工作面沿空掘巷合理位置模拟与应用[J].采矿与安全工程学报,2006,33(2):197-200.
|
[12] |
Yu Zhonglin,Tu Min.Simulation and application of suitable position of gob-side driving entry in large mining height face[J].Journal of Mining & Safety Engineering,2006,33(2):197-200.
|
[13] |
奚家米,毛久海,杨更社.回采巷道合理煤柱宽度确定方法研究与应用[J].采矿与安全工程学报,2008,25(4):400-403.
|
[14] |
Xi Jiami,Mao Jiuhai,Yang Gengshe.Method for determining rational pillar width in mining roadway along goaf[J].Journal of Mining & Safety Engineering,2008,25(4):400-403.
|
[15] |
刘增辉,高谦,华心祝,等.沿空掘巷围岩控制的时效性[J].采矿与安全工程学报,2009,26(4):465-469.
|
[16] |
Liu Zenhui,Gao Qian,Hua Xinzhu,et al.Characteristics of wall rock control in roadway driving along goaf[J].Journal of Mining & Safety Engineering,2009,26(4):465-469.
|
[17] |
张东升,王红胜,马立强.预筑人造帮置换窄煤柱的二步骤沿空掘巷新技术[J].煤炭学报,2010,35(10):1589-1593.
|
[18] |
Zhang Dongsheng,Wang Hongsheng,Ma Liqiang.Two step gob-side entry driving technology of pre-build artificial side substitute for narrow coal pillar[J].Journal of China Coal Society,2010,35(10):1589-1593.
|
[19] |
华心祝,刘淑,刘增辉,等.孤岛工作面沿空掘巷矿压特征研究及工程应用[J].岩石力学与工程学报,2011,30(8):1646-1651.
|
[20] |
Hua Xinzhu,Liu Shu,Liu Zenghui,et al.Research on strata pressure characteristic of gobside entry driving in island mining face and its engineering application[J].Journal of Rock Mechanics and Engineering,2011,30(8):1646-1651.
|
[21] |
张科学,姜耀东,张正斌,等.大煤柱内沿空掘巷窄煤柱合理宽度的确定[J].采矿与安全工程学报,2014,31(2):255-263.
|
[22] |
Zhang Kexue,Jiang Yaodong,Zhang Zhengbin,et al Determining the reasonable width of narrow pillar of roadway in gob entry driving in the large pillar[J].Journal of Mining & Safety Engineering,2014,31(2):255-263.
|
[23] |
李磊,柏建彪,王襄禹.综放沿空掘巷合理位置及控制技术[J].煤炭学报,2012,37(9):1464-1469.
|
[24] |
Li Lei,Bai Jianbiao,Wang Xiangyu.Rational position and control technique of roadway driving along next goaf in fully mechanized top coal caving face[J].Journal of China Coal Society,2012,37(9):1464-1469.
|
[25] |
李学华,梁顺,姚强岭,等.冲击倾向性围岩沿空掘巷防冲控制原理及应用[J].采矿与安全工程学报,2012,29(6):751-756.
|
[26] |
Li Xuehua,Liang Shun,Yao Qianglin,et al.Control principle and its application of rock burst in roadway driving along goaf with outburst-proneness surrounding rocks[J].Journal of Mining & Safety Engineering,2012,29(6):751-756.
|
[27] |
郑西贵,姚志刚,张农.掘采全过程沿空掘巷小煤柱应力分布研究[J].采矿与安全工程学报,2012,29(4):459-465.
|
[28] |
Zheng Xigui,Yao Zhigang,Zhang Nong Stress distribution of coal pillar with gob-side entry driving in the process of excavation & mining [J].Journal of Mining & Safety Engineering,2012,29(4):459-465.
|
[29] |
闫帅,陈勇,张自政.高瓦斯多巷系统回采巷道布置方法研究[J].煤炭学报,2013,38(9):1557-1562.
|
[30] |
Yan Shuai,Chen Yong,Zhang Zizheng Investigation of multi-entry gateroad layout in high gassy coal mines [J].Journal of China Coal Society,2013,38(9):1557-1562.
|
[31] |
张科学.深部煤层群沿空掘巷护巷煤柱合理宽度的确定[J].煤炭学报,2011,36(增刊1):28-35.
|
[32] |
Zhang Kexue Determining the reasonable width of chain pillar of deep coal seams roadway driving along next goaf [J].Journal of China Coal Society,2011,36(S1):28-35.
|
[33] |
王红胜,张东升,李树刚,等.基于基本顶关键岩块B断裂线位置的窄煤柱合理宽度的确定[J].采矿与安全工程学报,2014,31(1):10-16.
|
[34] |
Wang Hongsheng,Zhang Dongsheng,Li Shugang,et al Rational width of narrow coal pillar based on the fracture line location of key rock B in main roof [J].Journal of Mining & Safety Engineering,2014,31(1):10-16.
|
[35] |
陈忠辉,谢和平.综放采场支承压力分布的损伤力学分析[J].岩石力学与工程学报,2000,19(4):436-439.
|
[36] |
Chen Zhonghui,Xie Heping Damage mechanics analysis on the distribution of abutment pressure around a coal face [J].Chinese Journal of Rock Mechanics and Engineering,2000,19(4):436-439.
|
[37] |
王卫军,侯朝炯,柏建彪,等.综放沿空巷道顶煤受力变形分析[J].岩土工程学报,2001,23(2):209-212.
|
[38] |
Wang Weijun,Hou Chaojiong,Bai Jianbiao,et al.Mechanical deformation analysis of the roaf coal of road driving along next goaf in sublevel caving face [J].Chinese Journal of Geotechnical Engineering,2001,23(2):209-212.
|