Wang Zhiqiang, Wang Jianming, Guo Lei, Xu Jie. The research on mining along next goaf technology of double gateways excavation in super-long forward distance working face[J]. Journal of Mining Science and Technology, 2017, 2(4): 364-370.
Citation: Wang Zhiqiang, Wang Jianming, Guo Lei, Xu Jie. The research on mining along next goaf technology of double gateways excavation in super-long forward distance working face[J]. Journal of Mining Science and Technology, 2017, 2(4): 364-370.

The research on mining along next goaf technology of double gateways excavation in super-long forward distance working face

  • Received Date: 2016-07-04
  • Publish Date: 2017-07-25
  • With theoretical analysis and field measurement,the research is conducted on mining along next goaf technology of double gateways excavation in super-long forward distance working face.Mining along next goaf technology of double gateways excavation is proposed to solve larger leaved protective coal pillar caused by ventilation and auxiliary haulage in double gateways excavation in super-long forward distance.On this basis,a method is given to determined larger pillar in double gateways excavation,small coal pillar in gob-side entry driving and dip separation of driving direction in driving face along next goaf to the first mining face and continuous face.Finally,we propose the technology in 5000m super-long forward distance where skip-mining is impossible to apply and give critical technical parameter.The technology application not only improves present situation of roadway maintenance difficultly,but also helps to mine more than 1.01million t coal between two faces,generating significant economic and social benefits.
  • loading
  • [1]
    李学华,张农,侯朝炯.综采放顶煤面沿空巷道合理位置确定[J].中国矿业大学学报,2000,29(2):186-189.
    [2]
    Li Xuehua,Zhang Nong,Hou Chaojiong.Rational position determination of roadway driving along next goaf for fully mechanized top coal caving[J].Journal of China University of Mining & Technology,2000,29(2):186-189.
    [3]
    侯朝炯,李学华.综放沿空掘巷围岩大、小结构的稳定性原理[J].煤炭学报,2001,26(1):1-7
    [4]
    Hou Chaojiong,Li Xuehua.Stability principle of big and small structures of rock surrounding road driven along goaf in fully mechanized top coal caving face[J].Journal of China Coal Society,2001,26(1):1-7.
    [5]
    石永奎,宋振骐,王崇革.软煤层综放工作面沿空掘巷支护设计[J].岩土力学,2001,22(4):509-512
    [6]
    Shi Yongkui,Song Zhenqi,Wang Chongge.The supporting soft seam design of road driving along next goaf in with fully mechanized top-caving[J].Rock and Soil Mechanics,2001,22(4):509-512.
    [7]
    王卫军,冯涛,侯朝炯,等.沿空掘巷实体煤帮应力分布与围岩损伤关系分析[J].岩石力学与工程学报,2002,21(11):1590-1593.
    [8]
    Wang Weijun,Feng Tao,Hou Chaojiong,et al.Analysis on the relationship between stress distribution on intergated coal beside roadway driving along next goaf and damage of surrounding rocks[J].Journal of Rock Mechanics and Engineering,2006,33(11):1590-1593.
    [9]
    徐金海,缪协兴,张晓春.煤柱稳定性的时间相关性分析[J].煤炭学报,2005,30(4):433-437.
    [10]
    Xu Jinhai,Miao Xiexing,Zhang Xiaochun.Analysis of the time dependence of the coal pillar stability[J].Journal of China Coal Society,2005,30(4):433-437.
    [11]
    余忠林,涂敏.大采高工作面沿空掘巷合理位置模拟与应用[J].采矿与安全工程学报,2006,33(2):197-200.
    [12]
    Yu Zhonglin,Tu Min.Simulation and application of suitable position of gob-side driving entry in large mining height face[J].Journal of Mining & Safety Engineering,2006,33(2):197-200.
    [13]
    奚家米,毛久海,杨更社.回采巷道合理煤柱宽度确定方法研究与应用[J].采矿与安全工程学报,2008,25(4):400-403.
    [14]
    Xi Jiami,Mao Jiuhai,Yang Gengshe.Method for determining rational pillar width in mining roadway along goaf[J].Journal of Mining & Safety Engineering,2008,25(4):400-403.
    [15]
    刘增辉,高谦,华心祝,等.沿空掘巷围岩控制的时效性[J].采矿与安全工程学报,2009,26(4):465-469.
    [16]
    Liu Zenhui,Gao Qian,Hua Xinzhu,et al.Characteristics of wall rock control in roadway driving along goaf[J].Journal of Mining & Safety Engineering,2009,26(4):465-469.
    [17]
    张东升,王红胜,马立强.预筑人造帮置换窄煤柱的二步骤沿空掘巷新技术[J].煤炭学报,2010,35(10):1589-1593.
    [18]
    Zhang Dongsheng,Wang Hongsheng,Ma Liqiang.Two step gob-side entry driving technology of pre-build artificial side substitute for narrow coal pillar[J].Journal of China Coal Society,2010,35(10):1589-1593.
    [19]
    华心祝,刘淑,刘增辉,等.孤岛工作面沿空掘巷矿压特征研究及工程应用[J].岩石力学与工程学报,2011,30(8):1646-1651.
    [20]
    Hua Xinzhu,Liu Shu,Liu Zenghui,et al.Research on strata pressure characteristic of gobside entry driving in island mining face and its engineering application[J].Journal of Rock Mechanics and Engineering,2011,30(8):1646-1651.
    [21]
    张科学,姜耀东,张正斌,等.大煤柱内沿空掘巷窄煤柱合理宽度的确定[J].采矿与安全工程学报,2014,31(2):255-263.
    [22]
    Zhang Kexue,Jiang Yaodong,Zhang Zhengbin,et al Determining the reasonable width of narrow pillar of roadway in gob entry driving in the large pillar[J].Journal of Mining & Safety Engineering,2014,31(2):255-263.
    [23]
    李磊,柏建彪,王襄禹.综放沿空掘巷合理位置及控制技术[J].煤炭学报,2012,37(9):1464-1469.
    [24]
    Li Lei,Bai Jianbiao,Wang Xiangyu.Rational position and control technique of roadway driving along next goaf in fully mechanized top coal caving face[J].Journal of China Coal Society,2012,37(9):1464-1469.
    [25]
    李学华,梁顺,姚强岭,等.冲击倾向性围岩沿空掘巷防冲控制原理及应用[J].采矿与安全工程学报,2012,29(6):751-756.
    [26]
    Li Xuehua,Liang Shun,Yao Qianglin,et al.Control principle and its application of rock burst in roadway driving along goaf with outburst-proneness surrounding rocks[J].Journal of Mining & Safety Engineering,2012,29(6):751-756.
    [27]
    郑西贵,姚志刚,张农.掘采全过程沿空掘巷小煤柱应力分布研究[J].采矿与安全工程学报,2012,29(4):459-465.
    [28]
    Zheng Xigui,Yao Zhigang,Zhang Nong Stress distribution of coal pillar with gob-side entry driving in the process of excavation & mining [J].Journal of Mining & Safety Engineering,2012,29(4):459-465.
    [29]
    闫帅,陈勇,张自政.高瓦斯多巷系统回采巷道布置方法研究[J].煤炭学报,2013,38(9):1557-1562.
    [30]
    Yan Shuai,Chen Yong,Zhang Zizheng Investigation of multi-entry gateroad layout in high gassy coal mines [J].Journal of China Coal Society,2013,38(9):1557-1562.
    [31]
    张科学.深部煤层群沿空掘巷护巷煤柱合理宽度的确定[J].煤炭学报,2011,36(增刊1):28-35.
    [32]
    Zhang Kexue Determining the reasonable width of chain pillar of deep coal seams roadway driving along next goaf [J].Journal of China Coal Society,2011,36(S1):28-35.
    [33]
    王红胜,张东升,李树刚,等.基于基本顶关键岩块B断裂线位置的窄煤柱合理宽度的确定[J].采矿与安全工程学报,2014,31(1):10-16.
    [34]
    Wang Hongsheng,Zhang Dongsheng,Li Shugang,et al Rational width of narrow coal pillar based on the fracture line location of key rock B in main roof [J].Journal of Mining & Safety Engineering,2014,31(1):10-16.
    [35]
    陈忠辉,谢和平.综放采场支承压力分布的损伤力学分析[J].岩石力学与工程学报,2000,19(4):436-439.
    [36]
    Chen Zhonghui,Xie Heping Damage mechanics analysis on the distribution of abutment pressure around a coal face [J].Chinese Journal of Rock Mechanics and Engineering,2000,19(4):436-439.
    [37]
    王卫军,侯朝炯,柏建彪,等.综放沿空巷道顶煤受力变形分析[J].岩土工程学报,2001,23(2):209-212.
    [38]
    Wang Weijun,Hou Chaojiong,Bai Jianbiao,et al.Mechanical deformation analysis of the roaf coal of road driving along next goaf in sublevel caving face [J].Chinese Journal of Geotechnical Engineering,2001,23(2):209-212.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (613) PDF downloads(257) Cited by()
    Proportional views

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return