Citation: | Fu Shuai, Xie Beijing, Lü Pingyang, Wang Jiajian, Liu Wenbiao. Characteristics of high level borehole deviation and its influence on extraction effect[J]. Journal of Mining Science and Technology, 2017, 2(2): 158-166. |
[1] |
程远平,付建华,俞启香.中国煤矿瓦斯抽采技术的发展[J].采矿与安全工程学报,2009,26(2):127-139.
|
[2] |
Cheng Yuanping,Fu Jianhua,Yu Qixiang.Development of gas extraction technology in coal mines of China[J].Journal of Mining & Safety Engineering,2009,26(2):127-139.
|
[3] |
王伟,程远平,袁亮,等.深部近距离上保护层底板裂隙演化及卸压瓦斯抽采时效性[J].煤炭学报,2016,41(1):138-148.
|
[4] |
Wang Wei,Cheng Yuanping,Yuan Liang,et al.Floor fracture evolution and relief gas drainage timeliness in deeper underground short-distance upper protective coal seam extraction[J].Journal of China Coal Society,2016,41(1):138-148.
|
[5] |
王维忠,刘东,许江,等.瓦斯抽采过程中钻孔位置对煤层参数演化影响的试验研究[J].煤炭学报,2016,41(2):414-423.
|
[6] |
Wang Weizhong,Liu Dong,Xu Jiang,et al.Experimental study on the influence of drainage borehole position on dynamic parameters of coal seam in CBM recovery process[J].Journal of China Coal Society,2016,41(2): 414-423.
|
[7] |
王兆丰,李宏,杨宏民,等.采空区瓦斯治理及利用实践[J].煤炭科学技术,2011,39(4):55-59.
|
[8] |
Wang Zhaofeng,Li Hong,Yang Hongmin,et al.Practices on goaf gas control and utilization[J].Coal Science and Technology,2011,39(4):55-59.
|
[9] |
王红胜,李树刚,双海清,等.外错高抽巷高位钻孔卸压瓦斯抽采技术[J].中南大学学报:自然科学版,2016,47(4):1319-1327.
|
[10] |
Wang Hongsheng,Li Shugang,Shuang Haiqing,et al.Pressure-relief gas drainage technique by high level borehole in lateral high drainage roadway[J].Journal of Central South University:Science and Technology,2016,47(4):1319-1327.
|
[11] |
Brett J F,Beckett A D,Holt C A,et al.Uses and limitations of drillstring tension and torque models for monitoring hole conditions[J].Applied Drilling Engineering,1989,4(3):223-229.
|
[12] |
高德利.井眼轨迹控制问题的力学分析方法[J].石油学报,1996,17(1):115-121.
|
[13] |
Gao Deli.A mechanical model for prediction and control of the wellbore trajectory[J].Acta Petrolei Sinica,1996,17(1):115-121.
|
[14] |
高德利.井眼轨迹控制力学模型[J].力学学报,1995,27(4):501-505.
|
[15] |
Gao Deli.Mechanics model for prediction and control of the wellbore trajectory[J].Acta Mechanics Sinica,1995,27(4):501-505.
|
[16] |
高德利,徐秉业.石油钻井底部钻具组合大挠度三维分析[J].应用力学学报,1995,12(1):53-62.
|
[17] |
Gao Deli,Xu Bingye.Three-dimensional analysis of the static behavior of BHA under large deflection[J].Chinse.Journal of Applied Mechanics,1995,12 (1):53-62.
|
[18] |
Huang Wenjun,Gao Deli,Wei Shaolei,et al.A generalized quasi-static model of drill string system[J].Journal of Natural Gas Science & Engineering,2015,23:208-220.
|
[19] |
须志刚,蔡镜仑.PDC钻头切削齿试验的新方法[J].石油大学学报,1994,18(4):31-36.
|
[20] |
Xu Zhigang,Cai Jinglun.New approach to experimental studies of forces on PDC bit cutters[J].Journal of the University of Petroleum,1994,18(4):31-36.
|
[21] |
王红波,舒尚文,孙起昱,等.硬岩地层PDC钻头不良工况原因分析与改善措施[J].金刚石与磨料磨具工程,2012,32(3):42-45.
|
[22] |
Wang Hongbo,Shu Shangwen,Sun Qiyu,et al.Reason analysis and improving measures of PDC bit in hard formations under bad working conditions[J].Diamond & Abrasives Engineering,2012,32(3):42-45.
|
[23] |
邹德永,张将海,王瑞和.PDC钻头力学模型的试验研究[J].石油钻探技术,2005,33(2):11-13.
|
[24] |
Zou Deyong,Zhang Jianghai,Wang Ruihe.The experiment study on mechanical model of PDC bits [J].Petroleum Drilling Techniques,2005,33(2):11-13.
|
[25] |
李田军.PDC钻头破碎岩石的力学分析与机理研究[D].武汉:中国地质大学(武汉),2012:8-26.
|
[26] |
李政,孙再东.钻机凿岩偏斜的控制技术[J].矿业研究与开发,1998,18(5):34-37.
|
[27] |
Li Zheng,Sun Zaidong.The deviation control technique in drilling [J].Mining Research and Development,1998,18(5):34-37.
|
[28] |
吴万荣,魏建华,张永顺,等.大直径深孔凿岩钻孔偏斜的机理及其控制方案[J].中国有色金属学报,2001,11(1):153-156.
|
[29] |
Wu Wanrong,Wei Jianhua,Zhang Yongshun,et al.Drilling axial deviation mechanism and its control program for large-diameter blasthole rock-drilling[J].The Chinese Journal of Nonferrous Metals,2001,11(1):153-156.
|
[30] |
马新.水平定向钻杆力学效应模拟仿真研究[D].长春:吉林大学,2006:24-59.
|
[31] |
王红胜,杜政贤,樊启文,等.外错高抽巷卸压瓦斯抽采钻孔测斜与纠偏技术[J].煤炭科学技术,2015,43(8): 77-81.
|
[32] |
Wang Hongsheng,Du Zhengxian,Fan Qiwen,et al.Inclination measuring and deviation correction technology of pressure released gas drainage borehole in external dislocated high level gateway[J].Coal Science and Technology,2015,43(8):77-81.
|