Volume 9 Issue 2
Apr.  2024
Turn off MathJax
Article Contents
WANG Jun, LV Shunzhang, YANG Guang, WANG Bo, GU Changwan, WANG Gang. Bidirectional reinforcement of narrow pillar with inflatable lock-type anchor experimental investigation and its application[J]. Journal of Mining Science and Technology, 2024, 9(2): 258-269. doi: 10.19606/j.cnki.jmst.2024.02.012
Citation: WANG Jun, LV Shunzhang, YANG Guang, WANG Bo, GU Changwan, WANG Gang. Bidirectional reinforcement of narrow pillar with inflatable lock-type anchor experimental investigation and its application[J]. Journal of Mining Science and Technology, 2024, 9(2): 258-269. doi: 10.19606/j.cnki.jmst.2024.02.012

Bidirectional reinforcement of narrow pillar with inflatable lock-type anchor experimental investigation and its application

doi: 10.19606/j.cnki.jmst.2024.02.012
  • Received Date: 2023-11-10
  • Rev Recd Date: 2024-01-03
  • Publish Date: 2024-04-30
  • This study targets at asymmetric deformation of narrow coal pillar in gob-side entry driving.We put forward the bidirectional reinforcement of narrow pillar with opposite-crossing anchor cable.Specifically, we designed two types of anchor cable structure: the byelongation type and the expansion lock type, and carried out the pull-out test of opposite-crossing anchor cable, the test shows that both anchor cable structures could meet the tensile requirements.We conducted comparative analysis on the morphology of anchor cable failure, construction convenience and the economic aspect of material selection, where the expansion lock type crossed anchor was selected for narrow coal pillar bidirectional reinforcement.Furthermore, we investigated the bearing deformation patterns of coal pillars and the stress characteristics of anchor cables under different reinforcement methods through similar model tests and numerical simulation.Results show a 96.04% increase of peak load in the specimen reinforced by the double-row tight opposite-crossing anchor cable compared with that of the not reinforced specimen, and higher stability of the narrow pillar reinforced by the double-row tight opposite-crossing anchor cable as the rows of the anchor cable increases in number.The expansion lock anchor type crossed cable improved the energy storage and the critical failure point before the coal pillar was destroyed.Finally, the engineering test of expansive lock type crossed anchor cable to reinforcing narrow coal pillar was carried out in the transportation roadway of 123 lower 04 working face of Jining No.3 Coal Mine.The monitoring show that the anchoring force of the anchor cable exceeded 220kN, with 70& reduction of the coal pillar in the reinforcement area and good overall stability of the narrow coal pillar.It proves the feasibility of the bidirectional reinforcement technology of narrow pillar and provides new technical way for gob-side entry driving.
  • loading
  • [1]
    柏建彪. 沿空掘巷围岩控制[M]. 徐州: 中国矿业大学出版社, 2006: 13-62.

    BAI Jianbiao. Surrounding rock control of roadway excavation[M]. Xuzhou: China University of Mining and Technology Press, 2006: 13-62.
    [2]
    康红普, 张晓, 王东攀, 等. 无煤柱开采围岩控制技术及应用[J]. 煤炭学报, 2022, 47(1): 16-44. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB202201002.htm

    KANG Hongpu, ZHANG Xiao, WANG Dongpan, et al. Strata control technology and applications of non-pillar coal mining[J]. Journal of China Coal Society, 2022, 47(1): 16-44. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB202201002.htm
    [3]
    张广超, 何富连. 大断面综放沿空巷道煤柱合理宽度与围岩控制[J]. 岩土力学, 2016, 37(6): 1721-1728, 1736. https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX201606024.htm

    ZHANG Guangchao, HE Fulian. Pillar width determination and surrounding rocks control of gob-side entry with large cross-section and fully-mechanized mining[J]. Rock and Soil Mechanics, 2016, 37(6): 1721-1728, 1736. https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX201606024.htm
    [4]
    程利兴, 康红普, 姜鹏飞, 等. 深井沿空掘巷围岩变形破坏特征及控制技术研究[J]. 采矿与安全工程学报, 2021, 38(2): 227-236. https://www.cnki.com.cn/Article/CJFDTOTAL-KSYL202102002.htm

    CHENG Lixing, KANG Hongpu, JIANG Pengfei, et al. Deformation and failure characteristics and control technology of surrounding rocks in deeply gob-side entry driving[J]. Journal of Mining & Safety Engineering, 2021, 38(2): 227-236. https://www.cnki.com.cn/Article/CJFDTOTAL-KSYL202102002.htm
    [5]
    李学华, 鞠明和, 贾尚昆, 等. 沿空掘巷窄煤柱稳定性影响因素及工程应用研究[J]. 采矿与安全工程学报, 2016, 33(5): 761-769. https://www.cnki.com.cn/Article/CJFDTOTAL-KSYL201605001.htm

    LI Xuehua, JV Minghe, JIA Shangkun, et al. Study of influential factors on the stability of narrow coal pillar in gob-side entry driving and its engineering application[J]. Journal of Mining & Safety Engineering, 2016, 33(5): 761-769. https://www.cnki.com.cn/Article/CJFDTOTAL-KSYL201605001.htm
    [6]
    郭金刚, 王伟光, 岳帅帅, 等. 特厚煤层综放沿空掘巷围岩控制机理及其应用[J]. 煤炭学报, 2017, 42(4): 825-832. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB201704003.htm

    GUO Jingang, WANG Weiguang, YUE Shuaishuai, et al. Surrounding rock control mechanism and its application of gob-side driving entry in extra thick coal seam[J]. Journal of China Coal Society, 2017, 42(4): 825-832. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB201704003.htm
    [7]
    王志强, 郭磊, 苏泽华, 等. 倾斜中厚煤层错层位外错式巷道布置及相邻巷道联合支护技术[J]. 煤炭学报, 2020, 45(2): 542-555. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB202002004.htm

    WANG Zhiqiang, GUO Lei, SU Zehua, et al. Layout and combined support technology of alternate exterior stagger arrang-ement roadway and adjacent roadways in inclined and medium-thick coal seam[J]. Journal of China Coal Society, 2020, 45(2): 542-555. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB202002004.htm
    [8]
    陈正拜, 李永亮, 杨仁树, 等. 窄煤柱巷道非均匀变形机理及支护技术[J]. 煤炭学报, 2018, 43(7): 1847-1857. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB201807007.htm

    CHEN Zhengbai, LI Yongliang, YANG Renshu, et al. Non-uniform deformation mechanism and support technology of narrow coal pillar roadway[J]. Journal of China Coal Society, 2018, 43(7): 1847-1857. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB201807007.htm
    [9]
    于洋, 柏建彪, 王襄禹, 等. 残留煤柱工作面巷道布置及卸压控制研究[J]. 煤炭学报, 2020, 45(S1): 49-59. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB2020S1006.htm

    YU Yang, BAI Jianbiao, WANG Xiangyu, et al. Research on layout and pressure relief control of roadway with residual coal pillar mining face[J]. Journal of China Coal Society, 2020, 45(S1): 49-59. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB2020S1006.htm
    [10]
    张百胜, 王朋飞, 崔守清, 等. 大采高小煤柱沿空掘巷切顶卸压围岩控制技术[J]. 煤炭学报, 2021, 46(7): 2254-2267. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB202107020.htm

    ZHANG Baisheng, WANG Pengfei, CUI Shouqing, et al. Mechanism and surrounding rock control of roadway driving along gob in shallow-buried, large mining height and small coal Pillars by roof cutting[J]. Journal of China Coal Society, 2021, 46(7): 2254-2267. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB202107020.htm
    [11]
    王琦, 张朋, 蒋振华, 等. 深部高强锚注切顶自成巷方法与验证[J]. 煤炭学报, 2021, 46(2): 382-397. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB202102006.htm

    WANG Qi, ZHANG Peng, JIANG Zhenhua, et al. Automatic roadway formation method by roof cutting with high strength bolt-grouting in deep coal mine and its validation[J]. Journal of China Coal Society, 2021, 46(2): 382-397. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB202102006.htm
    [12]
    何满潮. 深部建井力学研究进展[J]. 煤炭学报, 2021, 46(3): 726-746. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB202103004.htm

    He Manchao. Research progress of deep shaft construction mechanics[J]. Journal of China Coal Society, 2021, 46(3): 726-746. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB202103004.htm
    [13]
    张洪伟, 万志军, 张源, 等. 工作面顺序接续下综放沿空掘巷窄煤柱稳定性控制[J]. 煤炭学报, 2021, 46(4): 1211-1219. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB202104018.htm

    ZHANG Hongwei, WAN Zhijun, ZHANG Yuan, et al. Stability control of narrow coal Pillars in the fully-mechanized gob side entry during sequenced top coal caving mining[J]. Journal of China Coal Society, 2021, 46(4): 1211-1219. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB202104018.htm
    [14]
    吴拥政, 陈金宇, 焦建康, 等. 冲击载荷作用下锚固围岩损伤破坏机制[J]. 煤炭学报, 2018, 43(9): 2389-2397. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB201809003.htm

    WU Yongzheng, CHEN Jinyu, JIAO Jiankang, et al. Damage and failure mechanism of anchored surrounding rock with impact loading[J]. Journal of China Coal Society, 2018, 43(9): 2389-2397. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB201809003.htm
    [15]
    王炯, 张正俊, 朱天赐, 等. 恒阻大变形锚索支护巷道变形机制模型试验研究[J]. 岩石力学与工程学报, 2020, 39(5): 927-937. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX202005007.htm

    WANG Jiong, ZHANG Zhengjun, ZHU Tianci, et al. Model test study on deformation mechanisms of roadways supported by constant resistance and large deformation anchor cables[J]. Chinese Journal of Rock Mechanics and Engineering, 2020, 39(5): 927-937. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX202005007.htm
    [16]
    谭云亮, 于凤海, 宁建国, 等. 沿空巷旁支护适应性原理与支护方法[J]. 煤炭学报, 2016, 41(2): 376-382. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB201602014.htm

    TAN Yunliang, YU Fenghai, NING Jianguo, et al. Adaptability theory of roadside support in gob-side entry retaining and its supporting design[J]. Journal of China Coal Society, 2016, 41(2): 376-382. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB201602014.htm
    [17]
    赵光明, 许文松, 孟祥瑞, 等. 扰动诱发高应力岩体开挖卸荷围岩失稳机制[J]. 煤炭学报, 2020, 45(3): 936-948. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB202003008.htm

    ZHAO Guangming, XV Wensong, MENG Xiangrui, et al. Instability mechanism of high stress rock mass under excavation and unloading induced by disturbance[J]. Journal of China Coal Society, 2020, 45(3): 936-948. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB202003008.htm
    [18]
    JIANG B Y, GU S T, WANG LG, et al. Strainburst process of marble in tunnel-excavation-induced stress path considering intermediate principal stress[J]. Journal of Central South University, 2019, 26(4): 984-999.
    [19]
    国家质量监督检验检疫总局, 中国国家标准化管理委员会. 预应力混凝土用钢绞线: GB/T 5224—2014[S]. 北京: 中国标准出版社, 2015.

    General Administration of Quality Supervision, Inspe-ction and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China. Steel strand for prestressed concrete: GB/T 5224—2014[S]. Beijing: Standards Press of China, 2015.
    [20]
    王波, 谷长宛, 王军, 等. 对穿锚索加固作用下沿空掘巷留设煤柱承压性能试验研究[J]. 中国矿业大学学报, 2020, 49(2): 262-270. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGKD202002007.htm

    WANG Bo, GU Changwan, WANG Jun, et al. Bear-ing capacity experimental study of coal pillar in the gob-side entry driving under the reinforcement of inflatable lock-type anchor[J]. Journal of China University of Mining & Technology, 2020, 49(2): 262-270. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGKD202002007.htm
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(23)  / Tables(6)

    Article Metrics

    Article views (33) PDF downloads(13) Cited by()
    Proportional views

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return