Citation: | Liu Yingchao, Liu Bo, Jiang Yusheng, Jiang Hua, Li Ting. Research on rock-breaking effect of TBM hob and application of new type cutter[J]. Journal of Mining Science and Technology, 2023, 8(3): 357-369. doi: 10.19606/j.cnki.jmst.2023.03.009 |
[1] |
Hansen A. Boreability testing, in Norwegian TBM tunnelling, chapter 2[M]. Trondheim: Norwegian Tunnelling Society, 1998: 21-26.
|
[2] |
王旭, 赵羽, 张宝刚, 等. TBM滚刀刀圈磨损机理研究[J]. 现代隧道技术, 2010, 47(5): 15-19. https://www.cnki.com.cn/Article/CJFDTOTAL-XDSD201005004.htm
Wang Xu, Zhao Yu, Zhang Baogang, et al. Research on the ring wear mechanism of TBM disc cutter[J]. Modern Tunnelling Technology, 2010, 47(5): 15-19. https://www.cnki.com.cn/Article/CJFDTOTAL-XDSD201005004.htm
|
[3] |
张照煌, 李福田. 全断面隧道掘进机施工技术[M]. 北京: 中国水利水电出版社, 2006.
|
[4] |
王旭, 李晓, 廖秋林. 岩石可掘进性研究的试验方法述评[J]. 地下空间与工程学报, 2009, 5(1): 67-73. doi: 10.3969/j.issn.1673-0836.2009.01.013
Wang Xu, Li Xiao, Liao Qiulin. A review of rock boreability testing for TBM tunnelling[J]. Chinese Journal of Underground Space and Engineering, 2009, 5(1): 67-73. doi: 10.3969/j.issn.1673-0836.2009.01.013
|
[5] |
祝和意, 杨延栋, 陈馈. 盾构滚刀破岩力及磨损速率预测模型推导[J]. 现代隧道技术, 2016, 53(5): 131-136, 144. https://www.cnki.com.cn/Article/CJFDTOTAL-XDSD201605019.htm
Zhu Heyi, Yang Yandong, Chen Kui. Breaking force derivation and wear rate forecast of shield disc cutters[J]. Modern Tunnelling Technology, 2016, 53(5): 131-136, 144. https://www.cnki.com.cn/Article/CJFDTOTAL-XDSD201605019.htm
|
[6] |
张厚美. TBM盘形滚刀磨损与滚刀滑动距离关系研究[J]. 隧道建设, 2017, 37(3): 369-374. https://www.cnki.com.cn/Article/CJFDTOTAL-JSSD201703021.htm
Zhang Houmei. Research on relationship between TBM disc cutter abrasion and disc cutter slipping distance[J]. Tunnel Construction, 2017, 37(3): 369-374. https://www.cnki.com.cn/Article/CJFDTOTAL-JSSD201703021.htm
|
[7] |
杜志国, 巩亚东. 基于破岩弧长的全断面掘进机滚刀磨损的研究[J]. 建筑机械, 2012(9): 73-76. https://www.cnki.com.cn/Article/CJFDTOTAL-JZJX201209044.htm
Du Zhiguo, Gong Yadong. Research on the wear of TBM disc cutters based on the arc of the rock breakage[J]. Construction Machinery, 2012(9): 73-76. https://www.cnki.com.cn/Article/CJFDTOTAL-JZJX201209044.htm
|
[8] |
张照煌. 全断面岩石掘进机平面刀盘上盘形滚刀磨损研究[J]. 现代隧道技术, 2007, 44(6): 32-36. https://www.cnki.com.cn/Article/CJFDTOTAL-XDSD200706006.htm
Zhang Zhaohuang. Study on the abrasion of disc cutters on full face rock tunnel boring machine[J]. Modern Tunnelling Technology, 2007, 44(6): 32-36. https://www.cnki.com.cn/Article/CJFDTOTAL-XDSD200706006.htm
|
[9] |
刘海龙, 曲传咏, 秦庆华. TBM滚刀刀圈与岩石的滑动磨损实验研究[J]. 实验力学, 2015, 30(3): 289-298. https://www.cnki.com.cn/Article/CJFDTOTAL-SYLX201503005.htm
Liu Hailong, Qu Chuanyong, Qin Qinghua. Experimental investigation on skimming wear mechanism between TBM cutter ring and rock[J]. Journal of Experimental Mechanics, 2015, 30(3): 289-298. https://www.cnki.com.cn/Article/CJFDTOTAL-SYLX201503005.htm
|
[10] |
王贺, 吴玉厚, 孙健, 等. 双滚刀岩石综合试验台分析与破岩试验研究[J]. 机械设计与制造, 2017(1): 182-185. https://www.cnki.com.cn/Article/CJFDTOTAL-JSYZ201701049.htm
Wang He, Wu Yuhou, Sun Jian, et al. Analysis and experimental research on rock breaking test bed with double disc cutters[J]. Machinery Design & Manufacture, 2017(1): 182-185. https://www.cnki.com.cn/Article/CJFDTOTAL-JSYZ201701049.htm
|
[11] |
龚秋明, 董贵良, 殷丽君, 等. 线性和旋转切割方式滚刀破岩试验对比研究[J]. 施工技术, 2017, 46(11): 61-66. https://www.cnki.com.cn/Article/CJFDTOTAL-SGJS201711015.htm
Gong Qiuming, Dong Guiliang, Yin Lijun, et al. Comparison study on the rock linear and rotating cutting test by TBM cutter[J]. Construction Technology, 2017, 46(11): 61-66. https://www.cnki.com.cn/Article/CJFDTOTAL-SGJS201711015.htm
|
[12] |
Chang S H, Choi S W, Bae G J, et al. Performance prediction of TBM disc cutting on granitic rock by the linear cutting test[J]. Tunnelling and Underground Space Technology, 2006, 21(3/4): 271.
|
[13] |
Wang H, Wu Y H, Sun H, et al. Analysis of rock comprehensive test bed with double disc cutters[J]. Advanced Science Letters, 2011, 4(8): 2747-2751.
|
[14] |
Liu B, Li T, Han Y H, et al. DEM-continuum mechanics coupling simulation of cutting reinforced concrete pile by shield machine[J]. Computers and Geotechnics, 2022, 152: 105036.
|
[15] |
苏利军, 孙金山, 卢文波. 基于颗粒流模型的TBM滚刀破岩过程数值模拟研究[J]. 岩土力学, 2009, 30(9): 2823-2829. https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX200909050.htm
Su Lijun, Sun Jinshan, Lu Wenbo. Research on numerical simulation of rock fragmentation by TBM cutters using particle flow method[J]. Rock and Soil Mechanics, 2009, 30(9): 2823-2829. https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX200909050.htm
|
[16] |
谭青, 李建芳, 夏毅敏, 等. 盘形滚刀破岩过程的数值研究[J]. 岩土力学, 2013, 34(9): 2707-2714. https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX201309044.htm
Tan Qing, Li Jianfang, Xia Yimin, et al. Numerical research on rock fragmentation process by disc cutter[J]. Rock and Soil Mechanics, 2013, 34(9): 2707-2714. https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX201309044.htm
|
[17] |
Liu B, Li T, Chang W, et al. Mechanical response of horseshoe-shaped tunnel lining to undercrossing construction of a new subway station[J]. Tunnelling and Underground Space Technology, 2022, 128: 104652.
|
[18] |
Li T, Zhang Z Y, Jia C T, et al. Investigating the cutting force of disc cutter in multi-cutter rotary cutting of sandstone: Simulations and experiments[J]. International Journal of Rock Mechanics and Mining Sciences, 2022, 152: 105069.
|
[19] |
刘高峰, 宋天田. 成都地铁盾构刀具磨损分析研究[J]. 隧道建设, 2007, 27(6): 89-93. https://www.cnki.com.cn/Article/CJFDTOTAL-JSSD200706026.htm
Liu Gaofeng, Song Tiantian. Analysis and study on wearing of cutting tools of shield machines used in Chengdu metro construction[J]. Tunnel Construction, 2007, 27(6): 89-93. https://www.cnki.com.cn/Article/CJFDTOTAL-JSSD200706026.htm
|
[20] |
Liu B, Yu Z W, Zhang R H, et al. Effects of undercrossing tunneling on existing shield tunnels[J]. International Journal of Geomechanics, 2021, 21(8): 04021131.
|
[21] |
杨延栋, 陈馈, 郭璐, 等. 全断面岩石隧道掘进机滚刀磨损影响因素分析[J]. 隧道建设, 2016, 36(11): 1394-1400. https://www.cnki.com.cn/Article/CJFDTOTAL-JSSD201611018.htm
Yang Yandong, Chen Kui, Guo Lu, et al. Analysis of influencing factors of wear of disc cutter of full-face hard rock tunnel boring machine[J]. Tunnel Construction, 2016, 36(11): 1394-1400. https://www.cnki.com.cn/Article/CJFDTOTAL-JSSD201611018.htm
|
[22] |
金艳秋, 刘志华, 杨亮, 等. 引洮工程9号隧洞TBM滚刀磨损原因分析[J]. 建筑机械化, 2011, 32(6): 79-81. https://www.cnki.com.cn/Article/CJFDTOTAL-JZJH201106028.htm
Jin Yanqiu, Liu Zhihua, Yang Liang, et al. Analyzing the cause of TBM disc cutter worn in Tao River diversion project No. 9 tunnel[J]. Construction Mechanization, 2011, 32(6): 79-81. https://www.cnki.com.cn/Article/CJFDTOTAL-JZJH201106028.htm
|
[23] |
刘颖超. 斜井TBM滚刀破岩机理及刀具磨损研究[D]. 北京: 中国矿业大学(北京), 2018.
|
[24] |
张照煌. 盘形滚刀与岩石相互作用理论研究现状及分析(二)[J]. 工程机械, 2009, 40(10): 18-22. https://www.cnki.com.cn/Article/CJFDTOTAL-GCJA200910007.htm
Zhang Zhaohuang. Present situation and analysis of theoretical research on interaction between disc hob and rock (2)[J]. Construction Machinery and Equipment, 2009, 40(10): 18-22. https://www.cnki.com.cn/Article/CJFDTOTAL-GCJA200910007.htm
|
[25] |
陶龙光, 刘波. 城市地下工程模拟试验系统: CN1696417A[P]. 2009-09-02.
|
[26] |
张彪, 张志强, 孙飞, 等. 基于三维颗粒流模型的TBM滚刀顺次破岩的研究[J]. 中国铁道科学, 2017, 38(4): 70-76. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK201704010.htm
Zhang Biao, Zhang Zhiqiang, Sun Fei, et al. Study on rock cutting sequentially by TBM disc cutter based on three-dimensional particle flow model[J]. China Railway Science, 2017, 38(4): 70-76. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK201704010.htm
|