Determining reasonable position of roadway for close coal seam

doi: 10.19606/j.cnki.jmst.2022.04.013
  • Received Date: 2021-09-13
  • Rev Recd Date: 2022-03-06
  • Publish Date: 2022-08-30
  • To study the layout of the short-distance thick underlying coal seam stopping roadway in Yanzishan Mine, a mechanical model of the remaining coal pillars in 4216 and 4218 of No. 4 sides of the overlying coal seam through theoretical calculation, and clarified the transfer law of the principal stress difference of the remaining coal pillars in the floor. The author simulated the distribution characteristics of vertical stress, horizontal stress and difference between principal stresses at different depths of floor by using FLAC3D numerical software, and analyzeds the principal stress difference and the stress reducing area roadway within the reasonable factors that influence of the reasonable inner distance. The results show that the roadway layout should avoid the peakand be in the environment of principal stress difference. When the horizontal distance of the lower coal seam is more than 30 m from the edge of the overlying coal pillar, the vertical stress is close to the original rock stress, the average principal stress difference is less than 1.24 MPa, and the principal stress difference change rate is low. Finally, the mining roadway of the working face of the lower coal seam is arranged with an inner stagger distance of 30 m. The field practice shows that the deformation of the surrounding rock is small under the misspacing, which can ensure the safety and efficient production of the mine.
  • loading
  • [1]
    杨科, 孔祥勇, 陆伟, 等. 近距离采空区下大倾角厚煤层开采矿压显现规律研究[J]. 岩石力学与工程学报, 2015, 34(S2): 4278-4285. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2015S2078.htm

    Yang Ke, Kong Xiangyong, Lu Wei, et al. Study of stratapressure behaviors with longwall mining in large inclination and thick coal seam under closed distance mined gob[J]. Chinese Journal of Rock Mechanics and Engineering, 2015, 34(S2): 4278-4285. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2015S2078.htm
    [2]
    郭放, 高保彬, 牛国庆, 等. 近距离煤层煤柱及采空区下综采工作面矿压规律研究[J]. 煤炭科学技术, 2017, 45(5): 92-97, 169. https://www.cnki.com.cn/Article/CJFDTOTAL-MTKJ201705016.htm

    Guo Fang, Gao Baobin, Niu Guoqing, et al. Study on mine strata pressure law of fully-mechanized coal mining face under coal Pillars and goaf in contiguous seams[J]. Coal Science and Technology, 2017, 45(5): 92-97, 169. https://www.cnki.com.cn/Article/CJFDTOTAL-MTKJ201705016.htm
    [3]
    琚宜文, 王桂梁, 胡超. 海孜煤矿构造变形及其对煤厚变化的控制作用[J]. 中国矿业大学学报, 2002, 31(4): 374-379. doi: 10.3321/j.issn:1000-1964.2002.04.011

    Ju Yiwen, Wang Guiliang, Hu Chao. Tectonic deformation and its control over thickness of coal seams in haizi coal mine[J]. Journal of China University of Mining & Technology, 2002, 31(4): 374-379. doi: 10.3321/j.issn:1000-1964.2002.04.011
    [4]
    张百胜, 杨双锁, 康立勋, 等. 极近距离煤层回采巷道合理位置确定方法探讨[J]. 岩石力学与工程学报, 2008, 27(1): 97-101. doi: 10.3321/j.issn:1000-6915.2008.01.015

    Zhang Baisheng, Yang Shuangsuo, Kang Lixun, et al. Discussion on method for determining reasonable position of roadway for ultra-close multi-seam[J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27(1): 97-101. doi: 10.3321/j.issn:1000-6915.2008.01.015
    [5]
    胡烈飞, 王福军, 陈文, 等. 近距离煤层下层综放工作面压架机制研究[J]. 煤炭技术, 2021, 40(1): 145-148.

    Hu Liefei, Wang Fujun, Chen Wen, et al. Study on mechanism of support crushing in lower fully mechanized caving face in close coal seams[J]. Coal Technology, 2021, 40(1): 145-148.
    [6]
    严国超, 胡耀青, 宋选民, 等. 极近距离薄煤层群联合开采常规错距理论与物理模拟[J]. 岩石力学与工程学报, 2009, 28(3): 591-597. doi: 10.3321/j.issn:1000-6915.2009.03.019

    Yan Guochao, Hu Yaoqing, Song Xuanmin, et al. Theory and physical simulation of conventional staggered distance during combined mining of ultra-close thin coal seam group[J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28(3): 591-597. doi: 10.3321/j.issn:1000-6915.2009.03.019
    [7]
    李臣, 李鹏, 鲁时雨, 等. 断层保护煤柱下采煤工作面保留巷道破坏分析及其控制[J]. 矿业科学学报, 2020, 5(5): 519-527. doi: 10.19606/j.cnki.jmst.2020.05.006

    Li Chen, Li Peng, Lu Shiyu, et al. Failure analysis and control of retained roadway at working face under protection coal pillar of the faults[J]. Journal of Mining Science and Technology, 2020, 5(5): 519-527. doi: 10.19606/j.cnki.jmst.2020.05.006
    [8]
    谢生荣, 李世俊, 黄肖, 等. 深部沿空巷道围岩主应力差演化规律与控制[J]. 煤炭学报, 2015, 40(10): 2355-2360. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB201510019.htm

    Xie Shengrong, Li Shijun, Huang Xiao, et al. Surrounding rock principal stress difference evolution law and control of gob-side entry driving in deep mine[J]. Journal of China Coal Society, 2015, 40(10): 2355-2360. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB201510019.htm
    [9]
    牛双建, 靖洪文, 杨大方. 深井巷道围岩主应力差演化规律物理模拟研究[J]. 岩石力学与工程学报, 2012, 31(S2): 3811-3820. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2012S2050.htm

    Niu Shuangjian, Jing Hongwen, Yang Dafang. Physical simulation study of principal stress difference evolutionlawof surrounding rock of deep mine roadways[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(S2): 3811-3820. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2012S2050.htm
    [10]
    何富连, 郑铮, 杨增强, 等. 基于主应力差影响的底板应力分布状态研究[J]. 煤矿安全, 2019, 50(11): 67-71. https://www.cnki.com.cn/Article/CJFDTOTAL-MKAQ201911015.htm

    He Fulian, Zheng Zheng, Yang Zengqiang, et al. Study on stress distribution state of floor based on the influence of principal stress difference[J]. Safety in Coal Mines, 2019, 50(11): 67-71. https://www.cnki.com.cn/Article/CJFDTOTAL-MKAQ201911015.htm
    [11]
    何文瑞, 何富连, 张坤, 等. 淋水软弱巷道注浆加固扩散机理与参数优化的研究[J]. 矿业科学学报, 2019, 4(3): 221-229. http://kykxxb.cumtb.edu.cn/article/id/217

    He Wenrui, He Fulian, Zhang Kun, et al. Diffusion mechanism and parameter optimization in the process of grouting reinforcement of drenching and soft roadway[J]. Journal of Mining Science and Technology, 2019, 4(3): 221-229. http://kykxxb.cumtb.edu.cn/article/id/217
    [12]
    鲁岩, 高杰, 刘长友, 等. 近距煤层同采巷道优化布置研究[J]采矿与安全工程学报, 2012, 29(6): 797-801. https://www.cnki.com.cn/Article/CJFDTOTAL-KSYL201206007.htm

    Lu Yan, Gao Jie, Liu Changyou, et al. Study on the optimal layout of roadways of contiguous seams by simultaneous mining[J]. Journal of Mining & Safety Engineering, 2012, 29(6): 797-801. https://www.cnki.com.cn/Article/CJFDTOTAL-KSYL201206007.htm
    [13]
    徐青云, 谭云, 黄庆国. 近距离煤层群下行开采底板应力分布规律研究[J]. 煤炭工程, 2019, 51(8): 89-92. https://www.cnki.com.cn/Article/CJFDTOTAL-MKSJ201908022.htm

    Xu Qingyun, Tan Yun, Huang Qingguo. Study on floor stress distribution in close distance downward mining coal seam[J]. Coal Engineering, 2019, 51(8): 89-92. https://www.cnki.com.cn/Article/CJFDTOTAL-MKSJ201908022.htm
    [14]
    索永录, 商铁林, 郑勇, 等. 极近距离煤层群下层煤工作面巷道合理布置位置数值模拟[J]. 煤炭学报, 2013, 38(S2): 277-282. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB2013S2004.htm

    Suo Yonglu, Shang Tielin, Zheng Yong, et al. Numerical simulation on rational location of roadways at lower seam for ultra-close multiple seam mining[J]. Journal of China Coal Society, 2013, 38(S2): 277-282. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB2013S2004.htm
    [15]
    李晓斌, 何富连, 秦宾宾, 等. 极近距离煤层回采巷道围岩分类与支护研究[J]. 矿业科学学报, 2020, 5(3): 325-333. http://kykxxb.cumtb.edu.cn/article/id/296

    Li Xiaobin, He Fulian, Qin Binbin, et al. Study on classification and support of surrounding rock of mining roadway in extremely close coal seams[J]. Journal of Mining Science and Technology, 2020, 5(3): 325-333. http://kykxxb.cumtb.edu.cn/article/id/296
    [16]
    陈冬冬, 武毅艺, 谢生荣, 等. 弹-塑性基础边界一侧采空基本顶板结构初次破断研究[J]. 煤炭学报, 2021, 46(10): 3090-3105. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB202110002.htm

    Chen Dongdong, Wu Yiyi, Xie Shengrong, et al. Study on the initial fracture of goaf basic roof structure on one side of elastic-plastic foundation boundary[J]. Journal of China Coal Society, 2021, 46 (10): 3090-3105. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB202110002.htm
    [17]
    罗吉安, 王连国. 近距离煤层煤柱下方底板应力分布规律[J]. 煤矿安全, 2014, 45(2): 29-31, 34. https://www.cnki.com.cn/Article/CJFDTOTAL-MKAQ201402009.htm

    Luo Jian, Wang Lianguo. Floor stress distribution laws under coal pillar in close distance coal seams[J]. Safety in Coal Mines, 2014, 45(2): 29-31, 34. https://www.cnki.com.cn/Article/CJFDTOTAL-MKAQ201402009.htm
    [18]
    徐芝纶. 弹性力学简明教程[M]. 3版. 北京: 高等教育出版社, 2002.
    [19]
    李忠华, 官福海. 弹塑性煤柱的应力场计算[J]. 采矿与安全工程学报, 2006, 23(1): 79-82. doi: 10.3969/j.issn.1673-3363.2006.01.017

    Li Zhonghua, Guan Fuhai. Calculation of stress field of elasto-plastic coal pillar[J]. Journal of Mining & Safety Engineering, 2006, 23(1): 79-82. doi: 10.3969/j.issn.1673-3363.2006.01.017
    [20]
    许磊, 张海亮, 耿东坤, 等. 煤柱底板主应力差演化特征及巷道布置[J]. 采矿与安全工程学报, 2015, 32(3): 478-484. https://www.cnki.com.cn/Article/CJFDTOTAL-KSYL201503022.htm

    Xu Lei, Zhang Hailiang, Geng Dongkun, et al. Principal stress difference evolution in floor under pillar and roadway layout[J]. Journal of Mining & Safety Engineering, 2015, 32(3): 478-484. https://www.cnki.com.cn/Article/CJFDTOTAL-KSYL201503022.htm
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(11)  / Tables(1)

    Article Metrics

    Article views (387) PDF downloads(39) Cited by()
    Proportional views

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return