Volume 7 Issue 2
Apr.  2022
Turn off MathJax
Article Contents
Miao Bing, Ge Shirong, Guo Yinan, Zhou Jiaxin, Jiang Ersong. Construction of digital twin system for intelligent mining in coal mines[J]. Journal of Mining Science and Technology, 2022, 7(2): 143-153. doi: 10.19606/j.cnki.jmst.2022.02.001
Citation: Miao Bing, Ge Shirong, Guo Yinan, Zhou Jiaxin, Jiang Ersong. Construction of digital twin system for intelligent mining in coal mines[J]. Journal of Mining Science and Technology, 2022, 7(2): 143-153. doi: 10.19606/j.cnki.jmst.2022.02.001

Construction of digital twin system for intelligent mining in coal mines

doi: 10.19606/j.cnki.jmst.2022.02.001
  • Received Date: 2021-05-26
  • Rev Recd Date: 2021-06-15
  • Publish Date: 2022-04-20

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(8)  / Tables(8)

    Article Metrics

    Article views (1587) PDF downloads(209) Cited by()
    Proportional views

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return