The application of grouting reinforcement to the broken surrounding rock of 1366 stoping roadway
-
摘要: 针对1366工作面回采巷道中围岩破碎的问题和巷道变形量大、底鼓、支护失效等现象,设计了巷道全断面分次注浆加固方案及渗透注浆工艺,确定了合理的注浆压力和浆液扩散半径。通过数值模拟对注浆前后围岩应力、塑性区分布、表面位移情况进行注浆加固效果预测。现场应用和监测表明:采用全断面分次注浆方案对回采巷道进行注浆加固后,巷道变形量大幅度缩小、巷道受力均匀、应力集中降低,与数值模拟结果基本一致。注浆加固方案有效加固了1366回采巷道围岩,控制了巷道围岩的稳定性,可为相似条件下巷道围岩控制提供参考。Abstract: This study proposes a fractional grouting reinforcement scheme of the roadway with full section to tackle surrounding rock breakage in the stoping roadway of 1366 working face and roadway deformation, floor heave and support failure.The infiltration grouting process is adopted to determine reasonable grouting pressure and grout diffusion radius for full section reinforcement.The stress, plastic zone distribution and surface displacement of surrounding rock before and after grouting are forecast through numerical simulation.Field application and monitoring show that: after the full section fractional grouting scheme is used to reinforce the mining roadway, the roadway deformation is considerably reduced, the roadway force is balanced, and the stress concentration is alleviated, which is basically consistent with the numerical simulation results.The grouting reinforcement scheme works to strengthen the surrounding rock of 1366 mining roadway, maintain the stability of surrounding rock of roadway, and provided references for the control of surrounding rock of roadway under similar conditions.
-
表 1 注浆工程量统计
Table 1. Grouting quantities
施工类别 施工长度/m 注浆孔数/个 水泥量/t 外加剂量/t 第一次注浆 290 755 196.5 19.65 第二次注浆 290 501 80.2 8.02 表 2 注浆前煤岩参数(岩层自上而下)
Table 2. Parameters of coal and rock before grouting(Strata from top to bottom)
岩性 体积模量/GPa 剪切模量/GPa 内摩擦角/(°) 黏聚力/MPa 抗拉强度/MPa 粉砂岩 18.57 13.6 35 8.8 1.70 中砂岩 17.57 17.6 34 9.1 1.70 砂砾岩 19.57 19.8 33 9.9 1.90 水泉1层 3.057 1.5 34 0.81 0.16 细砂岩 18.57 19.6 33 9.9 1.90 水泉2层 3.057 1.5 34 0.81 0.16 粉砂岩 16.57 12.6 35 8.8 1.70 水泉3层 3.057 1.5 34 0.81 0.16 细砂岩 18.57 19.6 33 9.9 1.90 粉砂岩 1.657 12.6 35 8.8 1.70 页岩 94.57 6.96 40 3.8 0.75 砂砾岩 19.57 19.8 33 9.9 1.90 表 3 注浆材料抗压强度
Table 3. Grouting strength of grouting material
时间/d 1 3 7 14 28 强度/MPa 5.0 7.4 18.6 22.8 25.0 表 4 锚杆(索)最大受力统计表
Table 4. Maximum stress of bolt(cable)
MPa 位置 断面1 断面2 断面3 断面4 断面5 断面6 平均 顶板 63 67 0 74 65 27 59.20 左帮 35 39 16 22 15 37 27.33 右帮 14 59 36 0 0 16 31.25 表 5 顶、底板相对位移测试数据
Table 5. Relative displacement test data of roof and floor
时间/d 位移/mm 断面1 断面2 断面3 断面4 断面5 断面6 0 0 0 0 0 0 0 6 0 7 7 0 0 0 12 8 14 48 0 0 0 18 19 20 31 5 15 13 24 26 31 43 11 25 22 30 31 39 49 17 28 27 36 39 40 52 25 37 30 42 39 42 53 32 44 35 48 40 47 55 33 42 40 54 40 54 57 35 43 47 60 41 56 58 34 49 43 表 6 两帮相对位移测试数据
Table 6. Relative displacement test data of two sides
时间/d 位移/mm 断面1 断面2 断面3 断面4 断面5 断面6 0 0 0 0 0 0 0 6 15 10 12 0 0 0 12 20 18 19 0 0 0 18 27 23 25 15 15 20 24 31 24 34 23 48 32 30 40 26 48 42 65 56 36 49 33 59 55 82 62 42 55 42 66 60 89 68 48 58 50 71 66 94 72 54 72 58 82 73 101 78 60 80 79 90 83 103 92 -
[1] 国家发展和改革委员会. 能源发展"十三五"规划[R]. 北京: 国家发展和改革委员, 2017. [2] 查文华, 华心祝, 黄嵘, 等. 分岔合并下伏煤层破碎顶板超前注浆加固技术[J]. 地下空间与工程学报, 2012, 8(5): 1014-1020. https://www.cnki.com.cn/Article/CJFDTOTAL-BASE201205020.htmZha Wenhua, Hua Xinzhu, Huang Rong, et al. Pre-grouting technology for broken roof of lower coal seam of splitting and merging coal[J]. Chinese Journal of Underground Space and Engineering, 2012, 8(5): 1014-1020. https://www.cnki.com.cn/Article/CJFDTOTAL-BASE201205020.htm [3] 程兆辉, 王春森. 破碎围岩巷道注浆加固技术研究[J]. 中国矿山工程, 2021, 50(3): 30-32. https://www.cnki.com.cn/Article/CJFDTOTAL-YSKS202103008.htmCheng Zhaohui, Wang Chunsen. A study of grouting consolidation for fragmented country rock roadways[J]. China Mine Engineering, 2021, 50(3): 30-32. https://www.cnki.com.cn/Article/CJFDTOTAL-YSKS202103008.htm [4] 张振峰, 康红普, 姜志云, 等. 千米深井巷道高压劈裂注浆改性技术研发与实践[J]. 煤炭学报, 2020, 45(3): 972-981. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB202003011.htmZhang Zhenfeng, Kang Hongpu, Jiang Zhiyun, et al. Study and application of high-pressure splitting grouting modification technology in coalmine with depth more than 1 000 M[J]. Journal of China Coal Society, 2020, 45(3): 972-981. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB202003011.htm [5] 康红普, 王国法, 姜鹏飞, 等. 煤矿千米深井围岩控制及智能开采技术构想[J]. 煤炭学报, 2018, 43(7): 1789-1800. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB201807001.htmKang Hongpu, Wang Guofa, Jiang Pengfei, et al. Conception for strata control and intelligent mining technology in deep coal mines with depth more than 1 000 m[J]. Journal of China Coal Society, 2018, 43(7): 1789-1800. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB201807001.htm [6] 范雷, 姜黎, 胡启芳. 微裂隙对工程岩体变形参数的影响分析[J]. 长江科学院院报, 2013, 30(2): 27-30, 34. https://www.cnki.com.cn/Article/CJFDTOTAL-CJKB201302005.htmFan Lei, Jiang Li, Hu Qifang. Influence of microcracks on deformation parameters of engineering rock mass[J]. Journal of Yangtze River Scientific Research Institute, 2013, 30(2): 27-30, 34. https://www.cnki.com.cn/Article/CJFDTOTAL-CJKB201302005.htm [7] 骆驰, 漆泰岳, 琚国全. 沿空送巷煤柱在锚杆支护下的稳定性研究[J]. 地下空间与工程学报, 2014, 10(2): 423-428. https://www.cnki.com.cn/Article/CJFDTOTAL-BASE201402031.htmLuo Chi, Qi Taiyue, Ju Guoquan. Study on stability of coal pillar supported by bolts in roadway driven along the goaf[J]. Chinese Journal of Underground Space and Engineering, 2014, 10(2): 423-428. https://www.cnki.com.cn/Article/CJFDTOTAL-BASE201402031.htm [8] 张农, 王保贵, 郑西贵, 等. 千米深井软岩巷道二次支护中的注浆加固效果分析[J]. 煤炭科学技术, 2010, 38(5): 34-38, 46. https://www.cnki.com.cn/Article/CJFDTOTAL-MTKJ201005013.htmZhang Nong, Wang Baogui, Zheng Xigui, et al. Analysis on grouting reinforcement results in secondary support of soft rock roadway in kilometre deep mine[J]. Coal Science and Technology, 2010, 38(5): 34-38, 46. https://www.cnki.com.cn/Article/CJFDTOTAL-MTKJ201005013.htm [9] 吴佐伟. 综采工作面过陷落柱注浆加固技术应用研究[J]. 山东煤炭科技, 2021, 39(2): 151-153. https://www.cnki.com.cn/Article/CJFDTOTAL-MTSD202102058.htmWu Zuowei. Research on application of grouting reinforcement technology in fully mechanized mining face passing subsidence column[J]. Shandong Coal Science and Technology, 2021, 39(2): 151-153. https://www.cnki.com.cn/Article/CJFDTOTAL-MTSD202102058.htm [10] 张进鹏, 刘立民, 刘传孝, 等. 基于预应力锚和自应力注的破碎围岩锚注加固应用研究[J]. 采矿与安全工程学报, 2021, 38(4): 774-783. https://www.cnki.com.cn/Article/CJFDTOTAL-KSYL202104014.htmZhang Jinpeng, Liu Limin, Liu Chuanxiao, et al. Application of bolt-grouting reinforcement for broken surrounding rock based on prestressed bolt and self-stress grouting[J]. Journal of Mining & Safety Engineering, 2021, 38(4): 774-783. https://www.cnki.com.cn/Article/CJFDTOTAL-KSYL202104014.htm [11] 杨绍斌, 洪晓东, 董伟, 等. 自限温聚氨酯注浆加固材料的自限温机理及应用性能[J]. 煤炭学报, 2014, 39(7): 1315-1320. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB201407020.htmYang Shaobin, Hong Xiaodong, Dong Wei, et al. Mechanism of self-controlling temperature for self-controlling temperature polyurethane grouting reinforced materials and its application properties[J]. Journal of China Coal Society, 2014, 39(7): 1315-1320. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB201407020.htm [12] 杨本生, 王仲永, 贾永丰, 等. 深部高应力工程软岩巷道非连续"双壳"围岩控制机理研究[J]. 采矿与安全工程学报, 2015, 32(5): 721-727. https://www.cnki.com.cn/Article/CJFDTOTAL-KSYL201505005.htmYang Bensheng, Wang Zhongyong, Jia Yongfeng, et al. Study on mechanism of the discontinuous "double shell" surrounding rock control in deep soft-engineering rock roadway[J]. Journal of Mining & Safety Engineering, 2015, 32(5): 721-727. https://www.cnki.com.cn/Article/CJFDTOTAL-KSYL201505005.htm [13] 王卫军, 彭刚, 黄俊. 高应力极软破碎岩层巷道高强度耦合支护技术研究[J]. 煤炭学报, 2011, 36(2): 223-228. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB201102011.htmWang Weijun, Peng Gang, Huang Jun. Research on high-strength coupling support technology of high stress extremely soft rock roadway[J]. Journal of China Coal Society, 2011, 36(2): 223-228. https://www.cnki.com.cn/Article/CJFDTOTAL-MTXB201102011.htm [14] 李树刚, 成小雨, 刘超, 等. 破碎围岩动压巷道锚索支护与注浆加固技术研究[J]. 煤炭科学技术, 2016, 44(1): 67-72. https://www.cnki.com.cn/Article/CJFDTOTAL-MTKJ201601011.htmLi Shugang, Cheng Xiaoyu, Liu Chao, et al. Research on technology of anchor cable supporting and grouting reinforcement for dynamic pressurized tunnel with crushed surrounding rock[J]. Coal Science and Technology, 2016, 44(1): 67-72. https://www.cnki.com.cn/Article/CJFDTOTAL-MTKJ201601011.htm [15] 张勇利, 张喜娟. 巷道破碎围岩加固技术应用与实践[J]. 煤炭与化工, 2014, 37(12): 13-16. https://www.cnki.com.cn/Article/CJFDTOTAL-HHGZ201412006.htmZhang Yongli, Zhang Xijuan. Roadway broken surrounding rock reinforcement technology application and practice[J]. Coal and Chemical Industry, 2014, 37(12): 13-16. https://www.cnki.com.cn/Article/CJFDTOTAL-HHGZ201412006.htm [16] 丁自伟, 邱华富. 破碎围岩巷道新型注浆加固工艺实验研究[J]. 地下空间与工程学报, 2016, 12(4): 958-962. https://www.cnki.com.cn/Article/CJFDTOTAL-BASE201604015.htmDing Ziwei, Qiu Huafu. Experimental research on new grouting reinforcement technology of roadways with fractured surrounding rock[J]. Chinese Journal of Underground Space and Engineering, 2016, 12(4): 958-962. https://www.cnki.com.cn/Article/CJFDTOTAL-BASE201604015.htm [17] 刘泉声, 卢超波, 刘滨, 等. 深部巷道注浆加固浆液扩散机理与应用研究[J]. 采矿与安全工程学报, 2014, 31(3): 333-339. https://www.cnki.com.cn/Article/CJFDTOTAL-KSYL201403001.htmLiu Quansheng, Lu Chaobo, Liu Bin, et al. Research on the grouting diffusion mechanism and its application of grouting reinforcement in deep roadway[J]. Journal of Mining & Safety Engineering, 2014, 31(3): 333-339. https://www.cnki.com.cn/Article/CJFDTOTAL-KSYL201403001.htm [18] 李术才, 冯啸, 刘人太, 等. 考虑渗滤效应的砂土介质注浆扩散规律研究[J]. 岩土力学, 2017, 38(4): 925-933. https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX201704002.htmLi Shucai, Feng Xiao, Liu Rentai, et al. Diffusion of grouting cement in sandy soil considering filtration effect[J]. Rock and Soil Mechanics, 2017, 38(4): 925-933. https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX201704002.htm [19] 骆建军, 陈保忠, 宋扬, 等. 碳化泥质板岩大断面隧道围岩松动圈测试研究[J]. 地下空间与工程学报, 2017, 13(4): 1047-1055. https://www.cnki.com.cn/Article/CJFDTOTAL-BASE201704028.htmLuo Jianjun, Chen Baozhong, Song Yang, et al. Expenimental research on surrounding rock loose circle of carbide argillaceous slate large cross section tunnel[J]. Chinese Journal of Underground Space and Engineering, 2017, 13(4): 1047-1055. https://www.cnki.com.cn/Article/CJFDTOTAL-BASE201704028.htm [20] 张庆松, 张连震, 张霄, 等. 基于浆液黏度时空变化的水平裂隙岩体注浆扩散机制[J]. 岩石力学与工程学报, 2015, 34(6): 1198-1210. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX201506014.htmZhang Qingsong, Zhang Lianzhen, Zhang Xiao, et al. Grouting diffusion in a horizontal crack considering temporal and spatial variation of viscosity[J]. Chinese Journal of Rock Mechanics and Engineering, 2015, 34(6): 1198-1210. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX201506014.htm [21] 刘健, 张载松, 韩烨, 等. 考虑黏度时变性的水泥浆液盾构壁后注浆扩散规律及管片压力模型的试验研究[J]. 岩土力学, 2015, 36(2): 361-368. https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX201502011.htmLiu Jian, Zhang Zaisong, Han Ye, et al. Backfilled grouting diffusion law and model of pressure on segments of shield tunnel considering viscosity variation of cement grout[J]. Rock and Soil Mechanics, 2015, 36(2): 361-368. https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX201502011.htm