基于图论-AHP管廊灾害影响评价及减灾分析

张召冉 于天富 项方备 刘国庆 夏雨欣

张召冉, 于天富, 项方备, 刘国庆, 夏雨欣. 基于图论-AHP管廊灾害影响评价及减灾分析[J]. 矿业科学学报, 2022, 7(2): 217-224. doi: 10.19606/j.cnki.jmst.2022.02.009
引用本文: 张召冉, 于天富, 项方备, 刘国庆, 夏雨欣. 基于图论-AHP管廊灾害影响评价及减灾分析[J]. 矿业科学学报, 2022, 7(2): 217-224. doi: 10.19606/j.cnki.jmst.2022.02.009
Zhang Zhaoran, Yu Tianfu, Xiang Fangbei, Liu Guoqing, Xia Yuxin. Utility tunnel disaster impact assessment and disaster reduction analysis based on graph theory and AHP[J]. Journal of Mining Science and Technology, 2022, 7(2): 217-224. doi: 10.19606/j.cnki.jmst.2022.02.009
Citation: Zhang Zhaoran, Yu Tianfu, Xiang Fangbei, Liu Guoqing, Xia Yuxin. Utility tunnel disaster impact assessment and disaster reduction analysis based on graph theory and AHP[J]. Journal of Mining Science and Technology, 2022, 7(2): 217-224. doi: 10.19606/j.cnki.jmst.2022.02.009

基于图论-AHP管廊灾害影响评价及减灾分析

doi: 10.19606/j.cnki.jmst.2022.02.009
基金项目: 

北京市教育委员会科技计划 KM202110009008

详细信息
    作者简介:

    张召冉(1981—),男,山东临朐人,博士,副教授,主要从事工程项目技术与管理方面的研究工作。Tel: 13810380402,E-mail: zhaoran2011@foxmail.com

    通讯作者:

    于天富(1994—),女,河北沧州人,硕士研究生,主要从事工程项目管理方面的研究工作。Tel: 15226599739,E-mail: 869326725@qq.com

  • 中图分类号: X43; TU990.3

Utility tunnel disaster impact assessment and disaster reduction analysis based on graph theory and AHP

  • 摘要: 地下综合管廊内有多种市政管线,一旦发生事故将造成巨大的财产损失和社会影响。准确评估管廊运营阶段灾害影响值,定量分析灾害的影响范围和影响程度可以实现防灾减灾的目的。本文通过分析管廊内外部致灾因素演化过程和运营阶段的灾害演化路径,基于图论和AHP方法建立灾害评价模型;以通州A段管廊项目为背景,运用所建模型得到该段管廊各灾害影响值,确定出需要重点管理的灾害链。研究结果表明:通州A段管廊灾害影响值较大的因素为爆炸、地震、质量和设计问题,并针对致灾因子、孕灾环境、承灾体等方面的灾害链提出了断链减灾管理方案。研究成果可为管廊防灾减灾提供借鉴。
  • 图  1  灾害演化路径简图

    Figure  1.  Disaster evolution path diagram

    图  2  灾害演化路径

    Figure  2.  Disaster evolution path

    图  3  灾害链

    Figure  3.  disaster chain

    表  1  内外部灾害因素演化结果

    Table  1.   Evolutionary results of internal and external disaster factors

    设计问题 质量问题 地震 洪涝
    转化 爆炸
    火灾
    爆炸
    火灾
    坍塌
    人员伤亡
    服务中断
    爆炸
    沙土进入管廊
    泄漏
    水淹
    管廊坍塌
    道路坍塌
    耦合 爆炸
    火灾
    爆炸
    火灾
    坍塌
    爆炸
    水淹
    水淹
    蔓延 二次火灾 人员中毒
    腐蚀管线
    水淹
    人员伤亡
    水淹
    人员伤亡
    衍生 人员伤亡
    道路坍塌
    服务中断
    人员伤亡
    道路坍塌
    服务中断
    人员伤亡
    道路坍塌
    服务中断
    人员伤亡
    道路坍塌
    服务中断
    下载: 导出CSV

    表  2  出入度值

    Table  2.   Out degree and in degree value

    灾害因素 出度 入度
    灾害1 a1 +a2 0
    灾害2 b1 0
    灾害3 c1 a1 +d1
    灾害4 d1 a2 +b1 + c1
    下载: 导出CSV

    表  3  标度

    Table  3.   Scale table

    数值 1 3 5 7 9 2,4,6,8
    定义 ij
    同等
    重要
    ij
    稍微
    重要
    ij
    较强
    重要
    ij
    强烈
    重要
    ij
    极端
    重要
    中间值
    注:ij分别为不同的影响条件,并且如果ji重要,数值可为倒数。
    下载: 导出CSV

    表  4  AHP标度值

    Table  4.   AHP scale value table

    C1 C2 Cj
    C1 C11 C12 C1j
    C2 C21 C22 C2j
    Ci Ci1 Ci2 Ci3 Cij
    注:Cij>0;Cij=1/CjiCij=1(ij=1,2,…,n)
    下载: 导出CSV

    表  5  A段管廊出入度值

    Table  5.   Out degree and in degree value of section A utility tunnel

    指标 出度 入度 指标 出度 入度
    设计
    问题
    7 0 质量
    问题
    11 0
    地震 9 0 洪涝 8 0
    人员
    伤亡
    0 13 道路
    坍塌
    0 11
    服务
    中断
    0 11 水淹 0 10
    爆炸 12 9 火灾 6 7
    泄漏 9 2 坍塌 6 5
    下载: 导出CSV

    表  6  权重值

    Table  6.   Weight value

    设计
    问题
    质量
    问题
    地震 洪涝 人员
    伤亡
    道路
    坍塌
    0.051 0.081 0.066 0.058 0.096 0.081
    服务
    中断
    水淹 爆炸 火灾 泄漏 坍塌
    0.081 0.074 0.154 0.096 0.081 0.081
    下载: 导出CSV

    表  7  发生灾害后产生影响的程度(AHP标度值)

    Table  7.   AHP scale value of the impact degree after the occurrence of disaster

    设计问题 质量问题 地震 洪涝 人员伤亡 道路坍塌 服务中断 水淹 爆炸 火灾 泄漏 坍塌
    设计问题 1 2 1/3 4 3 6 7 7 3 4 5 6
    质量问题 1/2 1 1/4 3 4 6 8 8 2 4 4 5
    地震 3 4 1 5 5 7 8 8 4 5 6 7
    洪涝 1/4 1/3 1/5 1 2 4 2 4 1/5 1/4 1/3 2
    人员伤亡 1/3 1/4 1/5 1/2 1 5 3 8 1/5 1/3 1/2 1
    道路坍塌 1/6 1/6 1/7 1/4 1/5 1 2 5 1/7 1/5 1/2 1/3
    服务中断 1/7 1/8 1/8 1/2 1/3 1/2 1 5 1/6 1/4 1/3 1/2
    水淹 1/7 1/8 1/8 1/4 1/8 1/5 1/5 1 1/7 1/6 1/4 1/4
    爆炸 1/3 1/2 1/4 5 5 7 6 7 1 3 5 6
    火灾 1/4 1/4 1/5 4 3 5 4 6 1/3 1 4 5
    泄漏 1/5 1/4 1/6 3 2 2 3 4 1/5 1/4 1 3
    坍塌 1/6 1/5 1/7 1/2 1 3 2 4 1/6 1/5 1/3 1
    下载: 导出CSV

    表  8  发生灾害后产生影响的程度权重值

    Table  8.   The degree weight of the impact after the occurrence of the disaster

    设计问题 质量问题 地震 洪涝 人员伤亡 道路坍塌
    0.172 0.143 0.259 0.042 0.042 0.021
    服务中断 水淹 爆炸 火灾 泄漏 坍塌
    0.020 0.012 0.129 0.082 0.048 0.03
    下载: 导出CSV

    表  9  灾害影响值

    Table  9.   Disaster impact value

    设计问题 质量问题 地震 洪涝 人员伤亡 道路坍塌
    0.88 1.16 1.71 0.24 0.40 0.16
    服务中断 水淹 爆炸 火灾 泄漏 坍塌
    0.16 0.09 1.99 0.79 0.39 0.24
    下载: 导出CSV
  • [1] Jin Yong, Luo Yuqiu, Geng Pan, et al. Risk analysis and early warning system of underground comprehensive pipe gallery[J]. International Core Journal of Engineering, 2020, 6(11): 393-400.
    [2] 黄萍, 林秋晖. 基于AHP-证据理论的综合管廊火灾安全评价[J]. 安全与环境学报, 2020, 20(1): 1-8. https://www.cnki.com.cn/Article/CJFDTOTAL-AQHJ202001001.htm

    Huang Ping, Lin Qiuhui. Safety evaluation of the utility tunnels' fire based on the AHP-evidence theory[J]. Journal of Safety and Environment, 2020, 20(1): 1-8. https://www.cnki.com.cn/Article/CJFDTOTAL-AQHJ202001001.htm
    [3] 郭佳奇, 钱源, 王珍珍, 等. 城市地下综合管廊常见运维灾害及对策研究[J]. 灾害学, 2019, 34(1): 27-33. doi: 10.3969/j.issn.1000-811X.2019.01.006

    Guojia Qi, Qian Yuan, Wang Zhenzhen, et al. The common operational disasters and countermeasures of utility tunnel in urban[J]. Journal of Catastrophology, 2019, 34(1): 27-33. doi: 10.3969/j.issn.1000-811X.2019.01.006
    [4] 张勇, 谢霞霞, 王祥宇, 等. 基于BN-bow-tie的智慧城市地下综合管廊运维灾害分析[J]. 建设科技, 2020(23): 58-61, 69. https://www.cnki.com.cn/Article/CJFDTOTAL-KJJS202023016.htm

    Zhang Yong, Xie Xiaxia, Wang Xiangyu, et al. Operation and maintenance disaster analysis of underground utility tunnel in smart city based on BN-bow-Tie[J]. Construction Science and Technology, 2020(23): 58-61, 69. https://www.cnki.com.cn/Article/CJFDTOTAL-KJJS202023016.htm
    [5] 周鲜华, 潘宏婷, 沈云飞. 地下综合管廊PPP模式风险因素评价: 基于ISM-MICMAC模型[J]. 会计之友, 2017(13): 59-64. doi: 10.3969/j.issn.1004-5937.2017.13.013

    Zhou Xianhua, Pan Hongting, Shen Yunfei. Evaluation of risk factors in the PPP model of underground utility tunnel-Based on ISM-MICMAC model[J]. Friends of Accounting, 2017(13): 59-64. doi: 10.3969/j.issn.1004-5937.2017.13.013
    [6] 王述红, 张泽, 侯文帅, 等. 综合管廊多灾种耦合致灾风险评价方法[J]. 东北大学学报: 自然科学版, 2018, 39(6): 902-906. https://www.cnki.com.cn/Article/CJFDTOTAL-DBDX201806028.htm

    Wang Shuhong, Zhang Ze, Hou Wenshuai, et al. Risk assessment method on multi-disaster coupled hazard for urban utility tunnel[J]. Journal of Northeastern University: Natural Science, 2018, 39(6): 902-906. https://www.cnki.com.cn/Article/CJFDTOTAL-DBDX201806028.htm
    [7] 董文静. 综合管廊全寿命周期风险分析与评价研究[D]. 西安: 长安大学, 2020.
    [8] 李宏远. 城市地下综合管廊运维安全风险管理研究[D]. 北京: 北京建筑大学, 2019.
    [9] 李金奎, 汪洋. 地下综合管廊地震响应研究进展[J]. 科学技术与工程, 2021, 21(9): 3428-3445. doi: 10.3969/j.issn.1671-1815.2021.09.002

    Li Jinkui, Wang Yang. Research progress of seismic response of underground utility tunnel[J]. Science Technology and Engineering, 2021, 21(9): 3428-3445. doi: 10.3969/j.issn.1671-1815.2021.09.002
    [10] 刘述虹. 典型综合管廊体系地震响应分析[D]. 哈尔滨: 中国地震局工程力学研究所, 2016.
    [11] Karin R S. Graph theory: an introduction to proofs, algorithms, and applications[M]. United States: CRC Press, 2021.
    [12] 朱嘉. 城市综合管廊安全风险辨识及评价体系研究[D]. 重庆: 重庆交通大学, 2017.
    [13] 王蕾. 脆弱性视角下城市地下综合管廊路径规划方法[D]. 西安: 西安建筑科技大学, 2017.
    [14] 杜伟升, 姜耀东, 焦振华, 等. 基于脆弱性指数法的整合矿井底板突水评价及主控因素分析[J]. 矿业科学学报, 2017, 2(2): 129-136. http://kykxxb.cumtb.edu.cn/article/id/56

    Du Weisheng, Jiang Yaodong, Jiao Zhenhua, et al. Study on the water inrush evaluation and major contributing factors determination using vulnerable index method in a built-up coal mine[J]. Journal of Mining Science and Technology, 2017, 2(2): 129-136. http://kykxxb.cumtb.edu.cn/article/id/56
    [15] 张俊杰, 刘守强, 纪润清, 等. 基于分区变权及AHP的煤层底板突水脆弱性评价[J]. 矿业科学学报, 2020, 5(2): 131-139. http://kykxxb.cumtb.edu.cn/article/id/273

    Zhang Junjie, Liu Shouqiang, Ji Runqing, et al. Vulnerability evaluation of water inrush in coal seam floor based on zone variable weight and AHP[J]. Journal of Mining Science and Technology, 2020, 5(2): 131-139. http://kykxxb.cumtb.edu.cn/article/id/273
    [16] 赵红泽, 李志伟, 孙健东, 等. 黑岱沟露天煤矿过断陷带开采程序优化选择[J]. 矿业科学学报, 2020, 5(2): 187-193. http://kykxxb.cumtb.edu.cn/article/id/279

    Zhao Hongze, Li Zhiwei, Sun Jiandong, et al. Optimization of mining sequence in the fault-subsiding area of Heidaigou open-pit mine[J]. Journal of Mining Science and Technology, 2020, 5(2): 187-193. http://kykxxb.cumtb.edu.cn/article/id/279
    [17] 李永红, 范启雄, 周家丹. 多重叠加灾害孕源断链减灾模式研究[C]. 第十一届国家安全地球物理专题研讨会, 中国陕西西安: 中国地球物理学会, 2015: 381-384.
    [18] 高小强. 北京通州综合管廊智慧运营与安全管理研究[D]. 北京: 中国矿业大学(北京), 2019.
    [19] 刘文方, 肖盛燮, 隋严春, 等. 自然灾害链及其断链减灾模式分析[J]. 岩石力学与工程学报, 2006, 25(S1): 2675-2681. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2006S1011.htm

    Liu Wenfang, Xiao Shengxie, Sui Yanchun, et al. Analysis of natural disaster chain and chain-cutting disaster mitigation mode[J]. Chinese Journal of Rock Mechanics and Engineering, 2006, 25(S1): 2675-2681. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2006S1011.htm
    [20] 谷晨. 综合管廊设计中的几点思考[J]. 城市建设理论研究: 电子版, 2017(22): 92-93. https://www.cnki.com.cn/Article/CJFDTOTAL-CSJL201722086.htm

    Gu Chen. Several Considerations on the Design of Comprehensive Pipeline Corridor[J]. Theoretical Research in Urban Construction, 2017(22): 92-93. https://www.cnki.com.cn/Article/CJFDTOTAL-CSJL201722086.htm