[1]
|
孟祥军, 聂玉峰, 张永恒, 等. PBA暗挖大跨度地铁车站二衬扣拱方案优化与工程实践[J]. 市政技术, 2017, 35(2): 61-66. doi: 10.3969/j.issn.1009-7767.2017.02.021Meng Xiangjun, Nie Yufeng, Zhang Yongheng, et al. Subway station scheme optimization and practice of the second lining arch of large span PBA[J]. Municipal Engineering Technology, 2017, 35(2): 61-66. doi: 10.3969/j.issn.1009-7767.2017.02.021
|
[2]
|
尚友磊, 谭准. 广州地铁流花路站超大断面暗挖工法优化[J]. 现代隧道技术, 2019, 56(3): 177-185. https://www.cnki.com.cn/Article/CJFDTOTAL-XDSD201903030.htmShang Youlei, Tan Zhun. Optimization of mined construction method for the super-large section liuhualu station of Guangzhou metro[J]. Modern Tunnelling Technology, 2019, 56(3): 177-185. https://www.cnki.com.cn/Article/CJFDTOTAL-XDSD201903030.htm
|
[3]
|
张明聚, 晋刘杰, 刘义, 等. 地铁车站PBA工法施工变形风险管控实例分析[J]. 武汉大学学报: 工学版, 2016, 49(6): 893-898, 910. https://www.cnki.com.cn/Article/CJFDTOTAL-WSDD201606016.htmZhang Mingju, Jin Liujie, Liu Yi, et al. A case study of risk management and control of construction deformations in metro station project built by PBA method[J]. Engineering Journal of Wuhan University, 2016, 49(6): 893-898, 910. https://www.cnki.com.cn/Article/CJFDTOTAL-WSDD201606016.htm
|
[4]
|
Xu X Z, Li Z P, Fang Q, et al. Challenges and countermeasures for using Pile-Beam-Arch approach to enlarge large-diameter shield tunnel to subway station[J]. Tunnelling and Underground Space Technology, 2020, 98: 103326. doi: 10.1016/j.tust.2020.103326
|
[5]
|
Liu J, Wang F, He S H, et al. Enlarging a large-diameter shield tunnel using the Pile-Beam-Arch method to create a metro station[J]. Tunnelling and Underground Space Technology, 2015, 49: 130-143. doi: 10.1016/j.tust.2015.04.006
|
[6]
|
Yu L, Zhang D L, Fang Q, et al. Surface settlement of subway station construction using pile-beam-arch approach[J]. Tunnelling and Underground Space Technology, 2019, 90: 340-356. doi: 10.1016/j.tust.2019.05.016
|
[7]
|
刘波, 付春青, 聂亚抄, 等. 洞桩法施工对地表沉降影响的数值模拟及实测研究[J]. 施工技术, 2018, 47(4): 115-119. https://www.cnki.com.cn/Article/CJFDTOTAL-SGJS201804029.htmLiu Bo, Fu Chunqing, Nie Yachao, et al. The influence of PBA method construction on surface settlement by numerical simulation and measured study[J]. Construction Technology, 2018, 47(4): 115-119. https://www.cnki.com.cn/Article/CJFDTOTAL-SGJS201804029.htm
|
[8]
|
李亮. 砂卵石地层中洞桩法施工对地表沉降的影响[J]. 市政技术, 2018, 36(3): 131-134. doi: 10.3969/j.issn.1009-7767.2018.03.042Li Liang. The influences of construction with PBA in sandy cobble stratum on ground settlement[J]. Municipal Engineering Technology, 2018, 36(3): 131-134. doi: 10.3969/j.issn.1009-7767.2018.03.042
|
[9]
|
刘蕊. 砂卵石地层不同形式PBA工法施工引起的地表沉降对比分析[J]. 市政技术, 2019, 37(6): 116-120, 125. https://www.cnki.com.cn/Article/CJFDTOTAL-SZJI201906039.htmLiu Rui. Comparative analysis of ground settlement caused by different forms PBA construction method in sandy pebble strata[J]. Municipal Engineering Technology, 2019, 37(6): 116-120, 125. https://www.cnki.com.cn/Article/CJFDTOTAL-SZJI201906039.htm
|
[10]
|
刘军, 吴玉勤, 荀桂富, 等. PBA工法中拱跨跨度对扣拱施工顺序影响的分析研究[J]. 市政技术, 2016, 34(1): 85-89. doi: 10.3969/j.issn.1009-7767.2016.01.026Liu Jun, Wu Yuqin, Xun Guifu, et al. Optimization analysis of heading excavation sequence for PBA method[J]. Municipal Engineering Technology, 2016, 34(1): 85-89. doi: 10.3969/j.issn.1009-7767.2016.01.026
|
[11]
|
刘波, 杨伟红. 考虑时间效应的隧道开挖三维沉降预测模型及应用[J]. 矿业科学学报, 2019, 4(5): 384-393. https://www.cnki.com.cn/Article/CJFDTOTAL-KYKX201905002.htmLiu Bo, Yang Weihong. Prediction model and application of three-dimensional ground surface settlement induced by tunnel excavation considering time effect[J]. Journal of Mining Science and Technology, 2019, 4(5): 384-393. https://www.cnki.com.cn/Article/CJFDTOTAL-KYKX201905002.htm
|
[12]
|
刘波, 杨伟红, 张功, 等. 基于隧道不均匀变形的地表沉降随机介质理论预测模型[J]. 岩石力学与工程学报, 2018, 37(8): 1943-1952. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX201808017.htmLiu Bo, Yang Weihong, Zhang Gong, et al. A prediction model based on stochastic medium theory for ground surface settlement induced by non-uniform tunnel deformation[J]. Chinese Journal of Rock Mechanics and Engineering, 2018, 37(8): 1943-1952. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX201808017.htm
|
[13]
|
李涛, 王益博, 郁志伟, 等. 变截面隧道开挖地表土体移动与沉降预测[J]. 中南大学学报: 自然科学版, 2020, 51(2): 433-444. https://www.cnki.com.cn/Article/CJFDTOTAL-ZNGD202002017.htmLi Tao, Wang Yibo, Yu Zhiwei, et al. Prediction of soil movement and settlement of excavated surface soil of variable section tunnel[J]. Journal of Central South University: Science and Technology, 2020, 51(2): 433-444. https://www.cnki.com.cn/Article/CJFDTOTAL-ZNGD202002017.htm
|
[14]
|
付春青. 城市暗挖大跨地铁车站"洞柱法"施工沉降控制措施[J]. 隧道建设, 2007, 27(S2): 465-470. https://www.cnki.com.cn/Article/CJFDTOTAL-JSSD2007S2095.htmFu Chunqing. Control measures for ground settlement during station construction with tunnel-column method[J]. Tunnel Construction, 2007, 27(S2): 465-470. https://www.cnki.com.cn/Article/CJFDTOTAL-JSSD2007S2095.htm
|
[15]
|
蔡小超, 冀小辉. 跳仓法在地铁上方下穿隧道中的应用[J]. 建筑技术, 2017, 48(11): 1160-1163. doi: 10.3969/j.issn.1000-4726.2017.11.011Cai Xiaochao, Ji Xiaohui. Application of sequence method on tunnel above metro[J]. Architecture Technology, 2017, 48(11): 1160-1163. doi: 10.3969/j.issn.1000-4726.2017.11.011
|
[16]
|
刘宝琛, 张家生, 李国华. 随机介质理论在矿业中的应用[M]. 长沙: 湖南科学技术出版社, 2004: 30-37.
|