留言板

尊敬的读者、作者、审稿人, 关于本刊的投稿、审稿、编辑和出版的任何问题, 您可以本页添加留言。我们将尽快给您答复。谢谢您的支持!

姓名
邮箱
手机号码
标题
留言内容
验证码

特厚煤层大采高综放工作面覆岩结构及支架工作阻力研究

侯运炳 何尚森 周殿奇 韩帅 周玉

侯运炳, 何尚森, 周殿奇, 韩帅, 周玉. 特厚煤层大采高综放工作面覆岩结构及支架工作阻力研究[J]. 矿业科学学报, 2017, 2(1): 42-48.
引用本文: 侯运炳, 何尚森, 周殿奇, 韩帅, 周玉. 特厚煤层大采高综放工作面覆岩结构及支架工作阻力研究[J]. 矿业科学学报, 2017, 2(1): 42-48.
Hou Yunbing, He Shangsen, Zhou Dianqi, Han Shuai, Zhou Yu. Analysis of overburden structure and support working resistance of working face in fully-mechanized top coal caving with large mining height in ultra thick coal seam[J]. Journal of Mining Science and Technology, 2017, 2(1): 42-48.
Citation: Hou Yunbing, He Shangsen, Zhou Dianqi, Han Shuai, Zhou Yu. Analysis of overburden structure and support working resistance of working face in fully-mechanized top coal caving with large mining height in ultra thick coal seam[J]. Journal of Mining Science and Technology, 2017, 2(1): 42-48.

特厚煤层大采高综放工作面覆岩结构及支架工作阻力研究

基金项目: 中央高校基本科研业务费专项资金(2011YZ02)
详细信息
    作者简介:

    侯运炳(1962—),男,陕西安康人,教授,博士生导师,主要从事资源开发与规划、资源开采新技术、充填采矿技术、数字矿山、矿区循环经济、矿业系统工程、矿物材料等方面的研究和教学工作。houyunbing2000@163.com

    通讯作者:

    何尚森(1987—),男,河南灵宝人,博士研究生,主要从事矿山压力与岩层控制方面的研究。Tel:18810538290

  • 中图分类号: TD323

Analysis of overburden structure and support working resistance of working face in fully-mechanized top coal caving with large mining height in ultra thick coal seam

  • 摘要: 为了掌握特厚煤层大采高综放工作面的覆岩结构及支架合理工作阻力,以同忻煤矿8107工作面为研究对象,采用理论分析、现场观测的方法对特厚煤层大采高综放工作面覆岩的破断和组合形式进行了研究,建立了覆岩力学模型,得出了同忻煤矿8107工作面支架工作阻力计算式。结果表明:正常开采期间,大采高综放工作面直接顶易形成具有整体性的倒台阶组合悬臂梁结构,悬臂梁结构的破断、回转是支架—围岩互馈过程中的主要压力来源;来压期间,高位砌体梁结构与低位悬臂梁结构耦合形成“砌体梁—悬臂梁”结构,砌体梁结构的滑落失稳引起悬臂梁结构的协同回转,是大采高综放工作面强冲击来压的原因;实测8107工作面正常回采以及来压时支架工作阻力分别为26 MPa(9750 kN)和40 MPa(15000kN),与理论计算结果较为吻合;8107工作面采用的ZF15000/27.5/42型四柱低位放顶煤支架能够满足生产需求。
  • [1] 王国法,刘俊峰,任怀伟.大采高放顶煤液压支架围岩耦合三维动态优化设计[J].煤炭学报,2011,36(1):145-151.
    [2] Wang Guofa,Liu Junfeng,Ren Huaiwei.Design and optimization of high seam-caving coal hydraulic support based on model of support and wall rock coupling[J].Journal of China Coal Society,2011,36(1):145-151.
    [3] 苏林军.大采高综放液压支架的设计研究[J].煤矿开采,2010,15(3):77-79.
    [4] Su Linjun.Design of full-mechanized caving powered support with large mining height[J].Coal Mining Technology,2010,15(3):77-79.
    [5] 李化敏,蒋东杰,李东印.特厚煤层大采高综放工作面矿压及顶板破断特征[J].煤炭学报,2014,39(10):1956-1960.
    [6] Li Huamin,Jiang Dongjie,Li Dongyin.Analysis of ground pressure and roof movement in fully-mechanized top coal caving with large mining height in ultra-thick seam[J].Journal of China Coal Society,2014,39(10):1956-1960.
    [7] 王金华.特厚煤层大采高综放开采关键技术[J].煤炭学报,2013,38(12):2089-2098.
    [8] Wang Jinhua.Key technology for fully-mechanized top coal caving with large mining height in extra-thick coal seam[J].Journal of China Coal Society,2013,38(12):2089-2098.
    [9] 张有喜.塔山矿特厚煤层综放开采的实践及展望[J].中国矿业,2011,20(9):72-75.
    [10] Zhang Youxi.Practice and prospect of fully mechanized top coal caving mining in ultra thick seam of Tashan mine[J].China Mining Magazine,2011,20(9):72-75.
    [11] 王金君,林媛媛,殷卫峰.浅析大采高综放开采技术与应用现状[J].煤矿开采,2013,18(6):1-4,56.
    [12] Wang Jinjun,Lin Yuanyuan,Yin Weifeng.Current situation of full-mechanized top-coal caving mining technology and its application[J].Coal Minging Technology,2013,18(6):1-4,56.
    [13] 查文华,华心祝,王家臣,等.深埋特厚煤层大采高综放工作面覆岩运动规律及支架选型研究[J].中国安全生产科学技术,2014,10(8):75-80.
    [14] Cha Wenhua,Hua Xinzhu,Wang Jiachen,et al.Study on strata movement rules and hydraulic support selection for fully-mechanized working face with large mining height of extra thick coal seam in deep well[J].Journal of Safety Science and Technology,2014,10(8):75-80.
    [15] 刘长友,杨敬轩,于斌,等.覆岩多层坚硬顶板条件下特厚煤层综放工作面支架阻力确定[J].采矿与安全工程学报,2015,32(1):7-13.
    [16] Liu Changyou,Yang Jingxuan,Yu Bin,et al.Support resistance determination of fully mechanized top-coal caving face in extra thick seam under multi-layered hard strata[J].Journal of Mining & Safety Engineering,2015,32(1):7-13.
    [17] 闫少宏,徐刚,张学亮,等.特厚煤层综放工作面大面积切顶压架原因分析[J].煤炭科学技术,2015,43(6):14-18,140.
    [18] Yan Shaohong,Xu Gang,Zhang Xueliang,et al.Reason analyses on large area roof cutting and collapse of hydraulic supports at fully-mechanized top coal caving mining face in ultra thick coal seams[J].Coal Science and Technology,2015,43(6):14-18,140.
    [19] 马立强,张东升,孙广京,等.厚冲积层下大采高综放工作面顶板控制机理与实践[J].煤炭学报,2013,38(2):199-203.
    [20] Ma Liqiang,Zhang Dongsheng,Sun Guangjin,et al.Thick alluvium full-mechanized caving mining with large mining height face roof control mechanism and practice[J].Journal of China Coal Society,2013,38(2):199-203.
    [21] 于雷,闫少宏,刘全明.特厚煤层综放开采支架工作阻力的确定[J].煤炭学报,2012,37(5):737-742.
    [22] Yu Lei,Yan Shaohong,Liu Quanming.Determination of support working resistance of top coal caving in extra thick coal seam[J].Journal of China Coal Society,2012,37(5):737-742.
    [23] 闫少宏.特厚煤层大采高综放开采支架外载的理论研究[J].煤炭学报,2009,34(5):590-593.
    [24] Yan Shaohong.Theory study on the load on support of long wall with top coal caving with great mining height in extra thick coal seam[J].Journal of China Coal Society,2009,34(5):590-593.
    [25] 钱鸣高,石平五.矿山压力与岩层控制[M].徐州:中国矿业大学出版社,2003:78-79.
    [26] 樊友景,高建华,李大望.均布荷载作用下两端固支梁的弹性力学解析解[J].河南科学,2006,24(2):237-240.
    [27] Fan Youjing,Gao Jianhua,Li Dawang.Analytical solution of the elastic mechanics for static indeterminate beams fixed at two sides under the even load[J].Henan Science,2006,24(2):237-240.
    [28] 于海湧,于海波,吴兆华.四柱式与两柱式放顶煤支架适用条件分析[J].中国煤炭,2011,37(9):59-63.
    [29] Yu Haiyong,Yu Haibo,Wu Zhaohua.Suitable conditions for four-leg and two-leg sublevel caving shield supports[J].China Coal,2011,37(9):59-63.
  • 加载中
计量
  • 文章访问数:  1254
  • HTML全文浏览量:  109
  • PDF下载量:  593
  • 被引次数: 0
出版历程
  • 收稿日期:  2016-06-19
  • 刊出日期:  2017-02-15

目录

    /

    返回文章
    返回